Loading...
HomeMy WebLinkAbout226258_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10191797 PROJECT ADDRESS: 6 E Hutton Center Dr Unit# 1100 PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: I A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/29/2016 INITIAL REVIEW 1/9/2017 EXPIRATION 6/27/2017 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Gary Williams 3. TEL: (949)701-4030 FAX: VALUATION:$70,436.00 EMAIL: gwilliams@lpainc.com FLOOD ZONE:X-0602320278J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide 48” landing at men’s and women’s bathroom.Provide 12” clearance to the strike edge of the door for both bathrooms.Provide 36” x 48” clearance at the urinal if the divider is deeper than 24”.Bathroom doors shall be located in the front partition or in the side wall or partition farthest from the water closet. CBC 11B-604.8.1.2Show location of the drinking fountains and show compliance with disabled access.