Loading...
HomeMy WebLinkAbout228617_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10192445 PROJECT ADDRESS: 1601 W Seventeenth St Unit# E-1 PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/27/2017 Roof equipment INITIAL REVIEW 3/30/2017 EXPIRATION 9/23/2017 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. David Kang 3. TEL: (949)336-6636 FAX: VALUATION:$5,000.00 EMAIL: dkang@cdieng.com FLOOD ZONE:X-0602320144J APPLICABLE CODE: 2016CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS(when needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. (FYI) This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information. Please remove MEP drawings, when applicable.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance8. Indicate the weight of all existing and new equipment on the drawings. Provide farming plan on the drawings and show location , size and weight of proposed equipment. Callout size and span for roof member that are supporting the new equipment. See roof framing plan on the drawings and add the information above. Drawings to be signed and stamped by the engineer.