HomeMy WebLinkAbout227648_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10192159
PROJECT ADDRESS:
2001 E Carnegie Ave
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
F-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
2/21/2017
INITIAL REVIEW
3/9/2017
EXPIRATION
8/20/2017
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Yvette Dabby
3.
TEL:
(818)789-1222
FAX:
VALUATION:$60,000.00
EMAIL:
yvettedabby@gmail.com
FLOOD ZONE:X-0602320279J
APPLICABLE CODE: 2016CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Resubmit 3 corrected sets of plans.Please return marked up set of drawings with corrections.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuancePlease refer to attached DAS Policy # 96-01 interpretation of accessibility application for seismic retrofit buildings that compliance is required. (Copy attached) Valuation of proposed project is calculated as $60,000.00. A minimum of 20% of valuation of construction is required to be spent towards providing disabled access in the priority order noted in the immediate previous item as noted in CBC Chapter 11-B, Division 2. Revise the drawings to show compliance. Show both existing elements and how they will be upgraded to current standards.Drawings to show accessibility compliance with Division 2, Chapter 11B of 2016 CBC. Provide specific accessibility details to show compliance with followings: - An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Parking, signage and alarms Please refer to attached SB 407 Form and provide completed Forms on the drawings to insure compliance.