HomeMy WebLinkAbout229384_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10192703
PROJECT ADDRESS:
451 E First St Unit# B
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
4/18/2017
INITIAL REVIEW
4/28/2017
EXPIRATION
10/15/2017
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
David Kang
3.
TEL:
(949)533-4117
FAX:
VALUATION:$100,330.00
EMAIL:
dkang@cdieng.com
FLOOD ZONE:X-0602320276J
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Provide plan check respond sheet. Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. A separate sheet for response may be used.Resubmit 3 corrected sets of plans. Please refer to red marks on the drawings for additional plan check comments.(When needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)County of Orange Health Department approval on the corrected/final set of drawings (667- 3600)
- Fire Department approval on the corrected/final sets of drawings 714-573-6108 Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceShow one hour separation between Existing M/B occupancy and proposed A-2 occupancy and provide full height wall detail. Show 5% of total dining seating is accessible. 11B-206, 2016 CBC. Show location and required clearances on the drawings. All dining, banquet, and bar facilities shall be made accessible to persons with disabilities At least 5%, but not less than one of the seating spaces in each functional area to be accessible as follows: drawing/details are required. Provide specific drawing/details to show compliance. Show location of accessible seating of the floor plan/ furniture plans.
- Provide a minimum 30” x 48” wheelchair clear floor space.
- Provide knee space at tables at least 27” high, 30” wide and 19” deep.
- Provide height of tables between 28” – 34” from the floor ground.
- Provide access to accessible seating space(s) by aisles with a minimum of 36” in width.Show/note ventilation requirements on the plans in accordance with the 2016 CBC and California Mechanical Code (CMC) requirements for each type of use.
Note on drawings: Provide mechanical ventilation for each area/room in accordance with the 2016 California Mechanical Code.
Note on drawings: Show/note LIGHTING requirements on the plans in accordance with CBC and California Electrical Code requirements for each type of use.Show compliance with following items to insure accessibility for existing or new doors: The floor or landing at each side of an exit door shall be level and having a length in the direction of the door swing of at least 60” and the length opposite the direction of door swing of 44” as measured at right angles to the plane of the door in the closed position. Show compliance on site plan where walkway is shown. Regardless of the occupant load, there shall be a floor or landing on each side of a door. The floor or landing shall be not more than ½” lower than the threshold of the doorway. Change in level between ¼” and ½” shall be beveled with a slope no greater than 1:2. Change in level greater than ½” shall be accomplished by means of a ramp. Provide detailed sections and plan views showing compliance at all doorways requiring accessibility.Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds.show location of drinking fountains based on Table 422.1 of CPC and minimum of two drinking fountains based on Section 11B-211 and 11B-602 of CBC. Show location of DF on the floor plan and provide specific details to insure compliance. Sanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 6”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.This building is subject to the State of California Energy Conservation Regulations:
- The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is
qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations
(CCR,) Title 24, Par 6, 2016 California Energy Code. The plan check consultant must sign documentation
certifying that a thorough, competent review has been performed on behalf of the Enforcement Agency.
- The corrected/final ARCHITECTURAL drawings shall have the required energy efficiency compliance
documentation with completed signature blocks filed on the plans. - The energy plan check consultant must complete the attached “Energy Conservation Plan Check Consultant
Qualification Statement.”