Loading...
HomeMy WebLinkAbout228831_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10192521 PROJECT ADDRESS: 3925 3/4 S Bristol St Unit# WCC01 PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/30/2017 INITIAL REVIEW 4/6/2017 EXPIRATION 9/26/2017 RECHECKS: 1. 05/01/2017 PROJECT APPLICANT CONTACT PERSON: 2. Nichole Garcia 3. TEL: (949)378-0900 FAX: VALUATION:$25,000.00 EMAIL: nichole.garcia@smartlinkllc.com FLOOD ZONE:X-0602320259JThe recheck of your project was completed today, 05-01-2017; and plans are approved for building permit issuance. Plans are placed at the plan check counter.Resubmit 2corrected sets of plans.This review does not include electrical work. Separate plan, application, fee, plan check, and permitisrequired for electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance .Provide construction details to clearly show the vertical and lateral loads path for this 4000+ Ib “battery cabinate” from the existing equipment platform shown on S-1 to the foundation system of the structure. Detail 3/D-2 does not show this load path.