HomeMy WebLinkAbout227382_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10192108-109
PROJECT ADDRESS:
1409 W Sixth St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
2/14/2017
INITIAL REVIEW
2/19/2017
EXPIRATION
8/13/2017
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Areli Ramirez
3.
TEL:
(323)636-1053
FAX:
VALUATION: $48,607.00
EMAIL:
Arelir@msn.com
FLOOD ZONE: X-0602320257J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper.
Provide a statement on the title sheet of the plans that this project shall comply with following codes:
- 2016 California Residential Code (CRC)
- 2016 California Building Code (CBC)
- 2016 California Electrical Code (CEC)
- 2016 California Mechanical Code (CMC)
- 2016 California Plumbing Code (CPC)
- 2016 California Green Building Standards Code (CGBS) or CALGreen
- 2016 California Energy Code (CEnC)
- City of Santa Ana Municipal Code
Provide eave / overhang / projection setback to all property lines.Projections of dwelling units and accessory buildings without an automatic residential fire sprinkler protection are not permitted less than 2 feet to the property line and are required to be 1 hour fire rated on the underside with a fire separation distance between 2 feet and 5 feet. (CRC Table R302.1 (1)) The minimum net area of under-floor space ventilation shall not be less than the floor area/150. (CRC R408.1) Access shall be provided to all under-floor spaces. The floor access shall be a minimum 18” by 24” and openings through a perimeter wall shall be not less than 16” by 24”. (CRC R408.4) Show window in new bathroom is tempered.Provide minimum 36” wide hallway to the bedrooms.
Add note on foundation plan: All hold downs must be tied in place prior to foundation inspection.
Post-beam connections must be detailed on the drawings ensuring against uplift and lateral displacement (2304.9.7)
The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1):
- All plumbing walls are to be framed with a minimum of 6" studs.
- Permissible notching and boring of joists are to be shown on the plans and shall not exceed CBC
Section 2308.10.4.2 allowances.
- Notching of exterior and bearing/nonbearing walls shall not exceed 25%/40% respectively. Bored
holes in bearing/nonbearing walls shall not exceed 40%/60% respectively. In no case shall the
edge of the bored hole be nearer than 5/8 inch to the edge of the stud. (2308.9.10 and 2308.9.11)
- Header and trimmer details for doors and windows are to be shown with full length trimmers,
specifying the size of the header and trimmer. (2308.10.4.3)
Provide details for retrofit shear and tension anchor bolts on plans. Provide calculations as needed
Call out anchor bolt size and spacing on foundation plan. Provide 1/2" diameter embedded 7" minimum at 6' o.c. maximum spacing (4' o.c. for 2 stories). CRC R403.1.6
Provide beam at the new opening in the existing bedroom.
Please revisit shear wall schedule and identify shear value for the shear wall schedule.
Please identify if the footing at the front of garage is new or existing.
Provide strap from the shear walls to the opening.
Beam shall be extended between the new openings between bath new bath and existing bedroom, please see red mark.
Detail D1/S1 doesn’t match location on sheet A5.
Show roof framing plan for new master bedroom, is there any ceiling joists.Revise framing plans to indicate insulation for walls R=13, ceiling R=30, and raise floor R=19 climate zone 8. Show U-Factor and SHGC for all the windows on the window schedule.Please fillout attached SB-407 and copy it on the drawings.