HomeMy WebLinkAbout229420_2_Corrections.docxSPC
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10192715
PROJECT ADDRESS:
2419 S Broadway
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
III B
OCCUPANCY CLASSIFICATION(S):
F-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
4/19/2017
INITIAL REVIEW
5/2/2017
EXPIRATION
10/16/2017
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Rasmi Ihmud
3.
TEL:
(949)293-3739
FAX:
(949)552-4957
VALUATION:$3,000.00
EMAIL:
FLOOD ZONE:X-0602320278J
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714) 573-6100).Prior to final approval of this project, approval from OC Fire should be obtained.
Engineer of record to add a statement on plans indicating that a visual inspection of the site was conducted and that the soils conform to whatever classification he/she deems applicable per the 2017 CBC.
Dimension the distance from the tank to the property line. Please note the minimum fire separation distance must be dictated by the fire department based on the hazard level of the propane tank.