Loading...
HomeMy WebLinkAbout230070_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10192931 PROJECT ADDRESS: 3306 1/2 S Park Dr PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/9/2017 INITIAL REVIEW 6/8/2017 EXPIRATION 11/5/2017 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Nee Sing Khoo 3. TEL: (714)788-9727 FAX: VALUATION: $20,000.00 EMAIL: southparkremodeling@gmail.com FLOOD ZONE: X-0602320259J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. TITLE SHEET Provide building information on plans: - Occupancy type: R3 / U - Construction type: Type V – B - Fire sprinklered: Yes / No? - Fire sprinkler type:(where applicable)Note on the Drawings: - Number of stories: - Existing building area: - New building area: - Area of remodel: Provide a statement on the title sheet of the plans that this project shall comply with following codes: - 2016 California Residential Code (CRC) - 2016 California Building Code (CBC) - 2016 California Electrical Code (CEC) - 2016 California Mechanical Code (CMC) - 2016 California Plumbing Code (CPC) - 2016 California Green Building Standards Code (CGBS) or CALGreen - 2016 California Energy Code (CEnC) - City of Santa Ana Municipal Code Engineer On Record’s signature is required on plan. Sheet A1-10 Provide a one-hour fire rated wall detail between the dwelling units and cross-reference detail on the floor plan. Provide a cross-section to show hull-height of the separation wall through the attic. Floor plan shows new wall construction near existing bathroom. Provide structural connection details. Provide existing floor plan and proposed floor plan. The proposed living room was an existing patio enclosure. Patio enclosure is considered as an outdoor space. To convert existing patio enclosure to a living space, provide energy documentation. In addition, the floor area of the new living space will be considered as an addition. Plumbing fixture is shown on plan. However, the scope of work does not include any plumbing fixture changes. Verify design. Note on floor plan indicates window’s energy efficiency rating (U-factor and SHGC factor). Please indicate new windows on the floor plan. Show smoke detectors and carbon monoxide location on the floor plan.