HomeMy WebLinkAbout230435_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10193054
PROJECT ADDRESS:
837 N Ross St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
UnKnown
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/23/2017
INITIAL REVIEW
6/13/2017
EXPIRATION
11/19/2017
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Karen Sarabia
3.
TEL:
(949)205-3954
FAX:
VALUATION:$2,000.00
EMAIL:
karen@elcentroculturaldemexico.org
FLOOD ZONE:X-0602320163J
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).Include address and telephone number of the responsible designer, and date of signing of drawings.Submit a letter addressed to building safety division describing exact use of the building and type of the business.Based on use of the building , this project might be subject to change of occupancy requirements, therefore additional comments might be given at the time of resubmittal.Exit illumination and exit sign requirements in accordance with CBC Section 1011 shall be shown on the drawings. Be specific as to the type of exit signs to be installed.Valuation of proposed project is calculated as $____________. A minimum of 20% of valuation of construction is required to be spent towards providing disabled access in the priority order noted in the immediate previous item as noted in CBC 11B Revise the drawings to show compliance. Show both existing elements and how they will be upgraded to current standards.Complete the attached Disabled Accessibility Documentation Form.