Loading...
HomeMy WebLinkAbout224581_5_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10191322 PROJECT ADDRESS: 2840 S Bristol St PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/9/2016 INITIAL REVIEW 11/28/2016 EXPIRATION 5/8/2017 RECHECKS: 1. 01/09/2017 PROJECT APPLICANT CONTACT PERSON: 2.03/02/2017 Preet Raey 3. 05/04/2017/ 06-05-2017 TEL: (714)966-9400 FAX: VALUATION:$1,600,000.00 EMAIL: preet@rsi-group.com FLOOD ZONE:X-0602320259J The recheck of your project was completed this morning, 06/05/2017; and the drawing is approved for building permit issuance subject to item # 9 from the list below. The plans are placed at the plan check counter for your convenience. Another review of your drawings was completed this morning, 05/04/2017; and only item # 41 was found with this new submittal. Items # 9, 27, 42, and 43 are still outstanding items. If you think an over the counter appointment/ recheck will help, please call me at 714-647-5862 and set up an appointment and hopefully these few items can be wrapped up and plans be ready for building permit issuance. The second recheck of your project was completed today, 03/02/2017; and the following items from the original plan check list are not done/ completed at this time. See the list below for item # 9, 27, 41, 42 & 43. (In the list below, all items in color blue need attention to be completed prior to building permit approval.) The recheck of your project was completed this morning, 01-09-2017; and the following items from the first plan check are not done/ completed at this time. See the list below for item # 9, 11, 12, 13, 16, 22, 24, 25, 26, 27, 29, 31, 35, 36, 38, 41, 42, and 43. Provide bracing for the roof joist in detail D3/S404, to transfer the lateral load of the demising wall to the roof diaphragm.This item is not completed at this time. Since this space is a part of an overall bigger space, we need to see a new floor plan of adjacent space after placing the demising wall to insure that the EXITING system of the adjacent space is not compromised due to this T.I. This item is not completed at this time. APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2013 California Building Standards Code with local amendments.For resubmittal package, please organize the drawings. Starting with the: cover sheet, site plan, demo plan, architectural sheets, structural sheets, misc. sheets.All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.The structural part of these drawings shall be signed before resubmittal to City for recheck.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Orange County Fire Authority approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceA separate Building Permit Application is required for: - Each sign - Trash enclosure(s) - Light standard(s) - Site improvements - Storage RacksProvide the following: - Provide a fully dimensioned site plan on each set of plans. Is not provided. - Disabled access compliance must be shown on the site plan. The door landing and truncated domes for the new door at the North wall is not provided. Also, the architectural information for the proposed new ramp at the West side is not provided at this time. The civil drawing has partial information but is not complete. See the red marks on the plan for these items. Show on the plans: - Occupancy Classification(s) , Is not provided. - Type of Construction,Provide complete details on the drawings showing compliance with CBC Section 1405 requirements for veneer construction.Is not provided.Provide on the drawings a complete door schedule, showing: - Door sizes - Hardware complying with exiting and disabled accessibility requirements - Show compliance with the City of Santa Ana’s Security Ordinance (Contact the Santa Ana Police Department Crime Prevention Section by telephoning 714-647-5840)Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”All doors require a level floor landing on each side in accordance with CBC Chapter 11B. Provide typical door threshold details and details of change in floor covering material.Is not provided.Provide specifications for doors hardware (i.e., lever type, push-pull panic, etc) to comply with disabled access requirements.The floor or landing at each side of an exit door shall be level and having a length in the direction of the door swing of at least 60” and the length opposite the direction of door swing of 44” as measured at right angles to the plane of the door in the closed position. See red marks on the drawings.Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. The bottom 10” of all doors except automatic and sliding shall have a smooth uninterrupted surface to allow the door to be opened by a wheelchair footrest without creating a trap or hazardous condition.Any accessible route of travel shall be considered a ramp if its slope is greater than 1’ rise in 20’ of horizontal run (5-percent gradient) and show compliance with CBC. - Pedestrian ramps used as exits shall show compliance with CBC. - Provide complete architectural plan views, sections, details, and notes for pedestrian ramps.Is not provided.Size of top and bottom landings. Top landings shall be not less than 60” wide and shall have a length of not less than 60” in the direction of ramp run. Landings at the bottom of ramps shall have a dimension in the direction of ramp run of not less than 72”.Encroachment of doors. Doors in any position shall not reduce the minimum dimension of the landing to less than 42” and shall not reduce the required width by more than 3” when fully open. See red marks on sheet A-402. Is not provided.Handrails for ramps: - Shall be placed on each side of each ramp, shall be continuous the full length of the ramp - Shall be 34 to 38” above the ramp surface to the top of the handrails, Please see the red marks on details C2 & C3/ A-503 - Shall extend a minimum of 1’ beyond the top and bottom of the ramp and shall be parallel with the floor or ground surface - Handrails projecting from a wall shall have a space of 1½” between the wall and the handrail, Is not provided. - The grip portion shall not be less than 1¼” nor more than 1½“ in cross-sectional nominal dimension, Is not provided. A guide curb a minimum of 2” in height shall be provided at each side of the ramp.Is not provided.Exit illumination and exit sign requirements in accordance with CBC Section 1006 shall be shown on the drawings. Be specific as to the type of exit signs to be installed.Is not provided. Please refer to Section 1006 of CBC for more information. This item is not completed at this time.CBC Section 1011, Requires exit signs to be readily visible from any direction of approach. No point shall be more than 100’ from the nearest visible exit sign. Tactile exit signs shall be required at the following locations: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.”It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide. Show compliance for the new exit doors on the south North and West sides.Is not provided.CBC Table 11B208.2 establishes the number of accessible parking spaces required. Revise the drawings to show at least 5disabled accessible parking spaces including 1van accessible spaces.Provide parking data on the site plan showing the total number of parking spaces provided, the number of disabled accessible spaces and the number of van accessible spaces, showing compliance with CBC Section 11B-208.One in every six accessible spaces, but not less than one, shall be served by an access aisle 8’-0” (96”) wide minimum and shall be designated van accessible. The words NO PARKING shall be painted on the ground within each eight’ loading and unloading access aisle. Show compliance with CBC Sections: 11B-227 and 11B-904for number of Check Stands, Is not provided. Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for: - New opening(s) in bearing wall(s)provide structural calc and construction details for 3 smaller openings in the North and West walls. - Storage racks over 8’ high - New mechanical equipment on roof (note on Roof Framing Plan weight of each existing and new piece of equipment on the roof) - New equipment screening on roofThe Demo plan on sheet D-101 is not clear. See red marks on this sheet.Provide an architectural detail to show the roof drain and the roof overflow drains for the new roofed areas.Is not provided.Please clarify on the roof plan if “Solar Equipment” is existing or proposed.Footing schedule on sheet S-101 shall be completed.Submit a signed copy of the Soils Report for this TI/ Addition permit.Is not provided.This item is not completed at this time.Completed on 05/04/2017Show compliance with CBC Section 602.3 for exterior walls of high roof above the entry area. See Sections B1/S501, S502, A/S503, & A1/S-504.Is not provided.This item is not completed at this time.See red marks on the following sheets of drawings: G-002, S-101, S-102, S-111, S-301, S-302, S-303, S-501,S-502, S-503, S-504, D-101, A-101, A-102, A-121, A-201, A-402, A-502, C-01, C-03 and C-04. Please resubmit marked up set with revised drawing for recheck.Only items in blue are not done/ completed at this time.