Loading...
HomeMy WebLinkAbout226199_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10191770 PROJECT ADDRESS: 2603 S Main St PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): A-2, B, M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/29/2016 INITIAL REVIEW 1/21/2017 EXPIRATION 6/27/2017 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Leon Felus 3. TEL: (310)821-2725 FAX: VALUATION:$400,000.00 EMAIL: leon@leonfelus.com FLOOD ZONE:X-0602320278J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2013 California Building Standards Code with local amendments.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).Include address and telephone number of the responsible designer, and date of signing of drawings.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings (667- 3600) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceState Division of Occupational Safety Permit (Cal/OSHA) (939-0145). A Cal/OSHA permit is required for: - Construction of trenches or excavations which are 5‘or deeper and into which a person is required to descend. - The construction or demolition of any building, structure, false-work, or scaffolding more than three stories high or the equivalent height.A separate Building Permit Application is required for: - Each building - Each structure - Each sign - Trash enclosure(s) - Fence(s) - Block wall(s) - Light standard(s) - Pedestrian protection - Demolition - Site improvements - Storage Racks - Screen Wall for Proposed Equipment Sheet A1.0 Previous Plan Check Comments: Provide accessible route from the building to trash enclosure. Second Plan Check Comments: Accessible route is shown on the site plan. However, the accessible route requires wheelchair users to travel behind vehicle which is not permitted by Code. Please revise accessible route design as necessary. Previous plan check comments on architectural drawings and structural drawings have been reviewed and approved.