Loading...
HomeMy WebLinkAbout229708_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10192823 PROJECT ADDRESS: 1405 S Auto Mall Dr PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: II B, SPK OCCUPANCY CLASSIFICATION(S): S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/27/2017 INITIAL REVIEW 5/4/2017 EXPIRATION 10/24/2017 RECHECKS: 1. 06/05/2017 PROJECT APPLICANT CONTACT PERSON: 2. Josh Hoover 3. TEL: (916)381-5588 FAX: VALUATION:$70,000.00 EMAIL: cad@airandlube.com FLOOD ZONE:X-0602320277J The recheck of your drawings was completed today, 06/05/2017; and drawings are approved for building permit issuance subject to item # 7 from the list below. The approved drawings are placed at the plan check counter for your conveniences. APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.Clearly indicate the scope of work under this building permit application: - Consider revise the “scope of work” on sheet: ‘EQ-O”tomatch the building permit application worksheet and reflect the work to be done under the subject building permit application. - Construction drawings must clearly show all work to be done under the subject building permit application. The sheet: “EQ-0” calls for “existing inground lefts” and “exiting tanks”. But the permit application is for installing these items. Please clarify the drawings.This review does not include mechanical, plumbing, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance