HomeMy WebLinkAbout231388_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10193303
PROJECT ADDRESS:
2721 S Harbor Blvd Unit# B
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812FAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/20/2017
INITIAL REVIEW
7/3/2017
EXPIRATION
12/17/2017
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Joe Walthour
3.
TEL:
(714)323-8580
FAX:
VALUATION:$25,000.00
EMAIL:
jwalthour@socal.rr.com
FLOOD ZONE:X-0602320258J
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.Please see corrections on submitted plans. Red marked set must be returned with revised plans.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.Provide typical section view detail of all new partitions and ceilings showing:
- Size, spacing, and material of framing members
- Note gauge and ICC Research Report number and installation/construction requirements for metal framing
members.
- It is the project designer’s responsibility to coordinate work with the various trades to ensure that the size of
the wall cavity will be large enough to accommodate piping, fittings, ducts, etc. There has been a continuing
field problem of 2½” wide metal studs not being able to accommodate plumbing pipes.
- Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13
for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations
and drawing prepared by a registered engineer are submitted for review. Submit structural engineering
calculations for walls in rooms with a floor to building structure above height greater than 14’.
- Provide on the drawings details for the lateral support of partitions, rails and similar space dividers less than
5’ 9” in height.
- Sheathing material and details of attachment. Note type, size, and spacing of fasteners.
- Heights of partition, suspended ceiling, structure above.
- Reference each fire-resistive assembly to a CBC Chapter 7 Table and Item number.It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B/Chapter 11B:
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsPlumbing facilities shall be provided in accordance with the California Plumbing Code (CPC) Section 412.0 and CPC Table 4-1.Separate, disabled accessible, sanitary facilities shall be provided for each gender in accordance with the California Plumbing Code (CPC) Section 412.3 and CBC Section 1115B.1.1.Complete the attached Disabled Accessibility Documentation Form.Providing drywall or furred wall at the front of the door is not acceptable. Either provide 4 hour area separation or leave door as existing.