Loading...
HomeMy WebLinkAbout230971_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civil Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10193202 PROJECT ADDRESS: 3024 S Main St PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/8/2017 Pool, Spa and equip. shell building for existing Apart. (R-2) INITIAL REVIEW 6/29/2017 EXPIRATION 12/5/2017 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Adrienne Tabo 3. TEL: (949)488-0865116 FAX: VALUATION: $10,000.00 EMAIL: Atabo@elementsarch.com FLOOD ZONE: X-0602320278J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Resubmit 3 corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment. Final drawings, Structural drawings to be signed and stamped by engineer responsible for structural calculations. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1). The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department (OCFA) approval on the corrected/final sets of drawings (647-5839 or 647-5700) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings (667- 3600) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance Provide building information on plans: Indicate original date of construction as of 1974 and followings: (Prior to March 13, 1991, 11-A, 2016 CBC) - Occupancy type: R-2 - Construction type: Type V – B - Fire sprinklered: Yes / NoSubmit a letter from owner clarifying the use of exiting pool and spa and if pool and spa is open to residence and their guess (Public) or open to residence only. A sign at entry gates is required if for residence use only and not open to Guess/Public). When open to Public compliance with Chapter 11-B is required.Please refer to attached SB407 handouts and provide a copy of completed and signed Forms on the drawings. Applicable to pool/spa area only)Provide structural calculation for design and justification of new spa including the attachment design of 300 LB for new permanent lift. 11B-1009.2.9, 2016 CBC. Submit calculations for design and justification for new Shell building for pool equipment. Architectural and structural drawings are required. Provide missing Sheets SP4.1 and 4.2. Additional plan check comments may apply.Drawings do not show any modification or a new gate; however Fire department information/ submittal sheet is showing addition/alteration to fence /gate. Please clarify.Show compliance with accessible gate including the kick plate at bottom of gate and hardware may be located at 54” max. Please refer to attached handout for pool/spa and fencing and insure that drawingsshow same compliance. Please note if perimeter of pool is 300 feet or more, minimum of two accessible entries is required when under jurisdiction of Chapter 11B, 2016 CBC. Section 11B-242.4, 2016 CBC