Loading...
HomeMy WebLinkAbout231593_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10193362 PROJECT ADDRESS: 2309 W Second St PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): F-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/26/2017 Pre-fab spry booth and pre-fab electric oven INITIAL REVIEW 8/9/2017 EXPIRATION 12/23/2017 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Peter Ayala 3. TEL: (714)366-8203 FAX: VALUATION:$24,000.00 EMAIL: MDI.DESIGNSPECIALIST@GMAIL.COM FLOOD ZONE:X-0602320257J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSResubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for: New opening(s) in existing roof for new duct opening of 36” in diameter. Provide partial roof framing plan and show size and spacing of exiting roof members around new opening. Incorporate results of structural calculations into drawings prior to re-submittal.