Loading...
HomeMy WebLinkAbout229723_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10192828 PROJECT ADDRESS: 1106 S Bristol St PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): A-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/27/2017 INITIAL REVIEW 5/4/2017 EXPIRATION 10/24/2017 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Juvenal Barajas 3. TEL: (760)702-0500 FAX: VALUATION:$80,000.00 EMAIL: FLOOD ZONE:X-0602320257J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Provide plan check respond sheet. Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. A separate sheet for response may be used.Resubmit 3 corrected sets of plans. Please refer to red marks on the drawings for additional plan check comments.(When needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831for an appointment.Please remove MEP Sheets except for when showing structural or one hour fire rating of Shaft. You may label MEP Sheets as reference only. This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 714-647-5800 for information. The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)County of Orange Health Department approval on the corrected/final set of drawings (667- 3600) - Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700) Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceShow location of 1 hour occupancy separation between existing buildings. See drawings for location. Panic hardware shall comply with CBC Section 1008.1.9. Panic hardware shall be provided as required by CBC for exit doors. Posting of occupant load. Every room or space that is assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Show location of sign with occupant load for dining area on the drawings with 59 maximum occupant load. Tactile signage is required. Show location of Tactile on the drawings and provide detail for height of sign per Section 703.4.1 of 2016 CBC. Please add occupant load of bar seating area to indicated 59 people of dining area. Show/note ventilation requirements on the plans in accordance with the 2016 CBC and California Mechanical Code (CMC) requirements for each type of use. Note on drawings: Provide mechanical ventilation for each area/room in accordance with the 2013 California Mechanical Code.Note on drawings: Show/note LIGHTING requirements on the plans in accordance with CBC and California Electrical Code requirements for each type of useProvide detail for 1 hour rated Shaft on the drawings. It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards. City of Santa Ana does not have jurisdiction to enforce ADA compliance and it is the responsibility of designer. If applicable please remove notes referring to ADA compliance from drawings. This project is reviewed for compliance with 2016 CBC.Valuation of proposed project is calculated as $80,000.00. A minimum of 20% of valuation of construction is required to be spent towards providing disabled access per Section 11B-202 of 2016 CBCTactile exit signs shall be required at the following locations, and show location of each applicable sign on the drawings exiting or accessibility drawings: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.”Please note that compliance with following Code Sections is required: Refer to additional red marks on the drawings for required clearances/ dimensions. - Section 11B-221, Assembly areas - Section 11B-226, dining surfaces and work surfaces - Section 11B-213, Toilet and bathing facilities - Section 11B-703, Signage, Communication elements and features. - Section 11B-904, Check-out aisles and counters.Show 5% of total dining seating is accessible. 11B-206, 2013 CBC. Show location and required clearances on the drawings. All dining, banquet, and bar facilities shall be made accessible to persons with disabilities At least 5%, but not less than one of the seating spaces in each functional area to be accessible as follows: drawing/details are required. Provide specific drawing/details to show compliance. Show location of accessible seating of the floor plan/ furniture plans. - Provide a minimum 30” x 48” wheelchair clear floor space. - Provide knee space at tables at least 27” high, 30” wide and 19” deep. - Provide height of tables between 28” – 34” from the floor ground. - Provide access to accessible seating space(s) by aisles with a minimum of 36” one side and 44” in width.Minimum of 60” length bar counter at 34” max height is required. Show compliance on the drawings.Show compliance with following items to insure accessibility for existing or new doors: Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. Hand-activated door opening hardware shall be centered between 34” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.Show location of drinking fountains based on Table 422.1 of CPC and minimum of two drinking fountains based on Section 11B-211 and 11B-602 of CBC. Show location of DF on the floor plan and provide specific details to insure compliance. Sanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 6”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.Note on the drawings hot water and drain pipes under lavatory shall be insulated. If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide. Please see drawings for location. Show compliance with Senate Bill 407 (Copy attached) As of January 1, 2014, SB 407 requires non-compliant plumbing fixtures to be replaced by water-conserving plumbing fixtures when a property is undergoing alterations or improvements as defined by the California Building Code and California Green Building Code. These codes define alteration and improvements as any construction to an existing structure which enhances or improves the structure. Construction related to repairs.