HomeMy WebLinkAbout230819_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10193154 PROJECT ADDRESS: 724 N Poinsettia St PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: III B OCCUPANCY CLASSIFICATION(S): B, F1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/5/2017 INITIAL REVIEW 6/12/2017 EXPIRATION 12/2/2017 RECHECKS: 1. 07/06/2017 PROJECT APPLICANT CONTACT PERSON: 2. Brian Ulaszewski 3. TEL: (562)901-2128 FAX: VALUATION:$300,000.00 EMAIL: FLOOD ZONE:X-0602320163J A recheck was done over the counter on 07/06/2017; and items # 10, 11, 15, 16, & 30 from the list below are not done/ completed at this time. APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete.The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments.The notes on the proposed site plan, sheet A1.00, and some other sheets are not readable. Please red marks on the plans. Revise the plans and make sure the entire note or readable.These new plans were submitted on 6/5/2017. The code edition on sheets A0.01 and A0.02 are referring to an out of date codes. Please update the code edition to 2016 codes.The cover sheet has crossed out references to 730 N. Poinsettia building, however, the title block of every sheet calls 724 & 730 N. Poinsettia Street. The title blocks shall be updated.The type on construction and occupancy group for the proposed TI is not clear. With the recorded Covenant, the issues regarding opening on property line on the North side of the building at 724 N. Poinsettia is changed. For proposed opening on the North wall of the building, the architect shall show the location of an assumed property line between 2 existing buildings and show compliance with CBC Section 705.8 & Table 705.8 for the proposed opening.A 7” step is shown for the altered front entry door to this building. This 7’’ step does not comply with CBC chapter 11B Section 11B-202 and 11B-202.4. Revise and show compliance.Show full compliance with CBC Section 11B-604 for the proposed restrooms. Layout plan on sheet A3.00 does not comply. See red marks on this sheet. Revised and resubmit.Provide a large scale details for proposed roof top units to clearly show compliance with CBC chapter 16 for vertical and lateral loads and proper construction details.Clearly indicate the scope of work under this building permit application: - Construction drawings must clearly show all work to be done under the subject building permit application.All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Orange County Fire Authority approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide the following: - Provide a fully dimensioned site plan on each set of plans. - Disabled access compliance must be shown on the site plan. - Show all property lines of record on the site plan. Show on the plans: - Project Address - Occupancy Classification(s) - Type of Construction - Area tabulation justifying floor area(s) of building(s) - Fire Sprinkler System - Number of stories/mezzanines and building height in feetOccupancies storing, handling, using, and/or selling hazardous materials, liquids, and chemicals shall submit a list of all said materials, listing their quantities and how they relate to specific California Building Code Table items. Note on the Floor Plan, type and quantity of hazardous material in each control area and fire-resistive rating for fire barriers.Provide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - It is the project designer’s responsibility to coordinate work with the various trades to ensure that the size of the wall cavity will be large enough to accommodate piping, fittings, ducts, etc. There has been a continuing field problem of 2½” wide metal studs not being able to accommodate plumbing pipes. - Method of attaching framing to the building structure. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. - Sheathing material and details of attachment. Note type, size, and spacing of fasteners. - Heights of partition, suspended ceiling, structure above. - Fire-blocks and draft-stops in combustible construction in accordance with CBC Section 717. Show location(s) and provide typical construction details.Provide on the drawings interior wall and ceiling finish schedule showing compliance with CBC Section 803 and CBC Table 803.11.Exiting from any occupied point in a building or structure on the subject site must be continuous, unobstructed, and undiminished to a public way. This includes gates which must show compliance with CDB Section 1010. Show compliance.Provide on the drawings a complete door schedule, showing: - Door sizes - Hardware complying with exiting and disabled accessibility requirements - Fire-rating of door assembly complying with CBC Section 705.8 Opening Protection for the proposed new door at the north side.Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”The width of the level area on the side to which the door swings shall extend 24” past the strike edge of the door for exterior doors and 18” past the edge for interior doors. Provide specifications for doors hardware (i.e., lever type, push-pull panic, etc) to comply with disabled access requirements.Regardless of the occupant load, there shall be a floor or landing on each side of a door. The floor or landing shall be not more than ½” lower than the threshold of the doorway. Change in level between ¼” and ½” shall be beveled with a slope no greater than 1:2. Change in level greater than ½” shall be accomplished by means of a ramp. Provide detailed sections and plan views showing compliance at all doorways requiring accessibility.Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. The bottom 10” of all doors except automatic and sliding shall have a smooth uninterrupted surface to allow the door to be opened by a wheelchair footrest without creating a trap or hazardous condition.Stairways shall show compliance with CBC Section 1011 including applicable disabled accessibility requirements. - Provide complete architectural plan view, sections, details, and notes for stairway(s). - Dimension stairway width showing compliance with CBC. - Dimension rise of steps shall be not less than 4” or greater than 7”. The run shall notbe less than 11”. - Treads, nosing, and risers require compliance with CBC including no open risers and slip resistant treads. - Dimension stairway headroom clearance. 6’ 8” minimum clearance.The walls and soffits within enclosed usable spaces under enclosed and unenclosed stairways shall be protected by 1-hour fire-resistance-rated construction.The upper approach and the lower tread of each interior stair shall be marked by a strip of clearly contrasting color at least 2” wide placed parallel to and close to (not more than 1” from) the nose of the step or landing to alert the visually impaired. The strip shall be of material that is at least as slip-resistant as the other treads of the stairs.Tactile floor designation signs that comply with chapters 10 and 11B, shall be located at each floor level landing in all enclosed stairways in buildings two or more stories in height to identify the floor level. At exit discharge level, the sign shall include a raised five-pointed star located to the left of the identifying floor level. The outside diameter of the star shall be the same as the height of the raised characters.Provide handrail details on the drawings showing compliance with CBC Section 1010, and 11B. - Stairways shall have handrails on each side. - Handrails shall be 34 to 38” above the nosing of treads. - Handrails shall extend a minimum of 12” beyond the top nosing, and shall extend a minimum of 12” plus the tread width beyond the bottom nosing. - Ends of handrails shall be returned or shall terminate in newel posts of safety terminals. - Handrails projecting from a wall shall have a space of 1½” between the wall and the handrail. - The handgrip potion of handrails shall not be less than 1¼” nor more than 1½” cross-sectional dimension or the shape shall provide an equivalent gripping surface. The handgrip portion of handrails shall have a smooth surface with no sharp corners. Means of egress illumination requirements in accordance with CBC Section 1008 shall be shown on the drawings. CBC Section 1013. Provide a directional exit sign from any direction of egress travel. Requires exit signs to be readily visible from any direction of approach. No point shall be more than 100’ from the nearest visible exit sign. Revise the drawings to show compliance.CBC Section 1008.2.1, Requires means of egress from all occupied parts of the building be provided with at least 1’ candle of light at floor level. Show compliance on the drawings.Tactile exit signs shall be required at the following locations: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit door that leads directly to a grade-level exterior exit by means of a stairway or ramp shall be identified by a tactile exit sign with the following words as appropriate:“EXIT STAIR DOWN”“EXIT STAIR UP” - Each exit door that leads directly to a grade-level exterior exit by means of an exit enclosure, or an exit passageway, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Chapter 11B: - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsEntrance(s) to the building or facility and primary path of travel to the specific area of new work, alteration, structural repair or addition shall be accessible. Path of travel incorporated all elements from the exterior arrival site to remodeled area.The accessible route of travel shall be the most practical direct route between accessible building entrances, accessible site facilities, and the accessible entrance to the site.At every entrance and at every major junction along or leading to an accessible route of travel, there shall be a sign displaying the international symbol of accessibility. Signs shall indicate the direction to accessible building entrances and facilities and shall comply with the requirements found in CBC chapter 11B.If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide.Revise the drawings to show the words NO PARKING shall be painted on the ground within each loading and unloading access aisle. This notice shall be painted in white letters no less than 12” high and located so that it is visible to traffic enforcement officials. Provide parking space identification in accordance with CBC Section 11B-208 including: - Each parking space reserved for persons with physical disabilities shall be identified by a reflecting sign permanently posted immediately adjacent to and visible from each stall or space, consisting of a profile view of a wheelchair with occupant in white on dark blue background. The sign shall not be smaller than 70 square inches in area and, when in path of travel, shall be posted at a minimum height of 80” from the bottom of the sign to the parking space finished grade and shall be un-obscured by a parked vehicle. Signs may also be centered on the wall at the interior end of the parking space. An additional sign or additional language below the symbol of accessibility shall state “Minimum Fine $250.” - An additional sign shall also be posted in a conspicuous place at each entrance to off-street parking facilities, or immediately adjacent to and visible from each stall or space. The sign shall not be less than 17” by 22” in size with lettering not less than 1” in height, with clearly and conspicuously states the following:Unauthorized vehicles parked in designated accessible spaces not displaying distinguishing placards or license plates issued for persons with disabilities may be towed away at owner’s expense. Towed vehicles may be reclaimed by telephoning the Santa Ana Police Department at (714) 245-8665. CVC 22658a.Provide completely dimensioned floor plans, elevations and sections of sanitary facility insuring wheelchair clearances complying with CBC Section 11B604 and the California Plumbing Code.Note on the drawings hot water and drain pipes under lavatory shall be insulated.Provide a table on the drawings showing number of employees by gender, the number of each type of fixture required and the number of each type of fixture provided.Drinking fountains serving the area of new work shall be accessible. Glass and glazing shall be in accordance with CBC Chapter 24. Note on the drawings all windows and doors having glazing. Indicate the type and thickness of each light of glazing on the drawings.Show/note ventilation requirements on the plans in accordance with the CBC and California Mechanical Code (CMC) requirements for each type of use. Note on drawings: - All enclosed portions of buildings customarily occupied by human beings shall be provided with natural ventilation by means of openable exterior openings readily controllable by building occupants, with an area not less than 4% of the floor area being ventilated. - Or provide mechanical ventilation according to CMC.Provide a complete suspended ceiling system plan and section detail showing the following: - Vertical supports - Seismic wires - Seismic strut/Compression strut - Perimeter wires - Separate fixture wires for lights and mechanical devices - ICC Research Report number for the suspended ceilingNote ICC Research Report Number on the drawings for the suspended ceiling system. (ICC Report Number 1308)Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for: - Stairway(s). - Handrail(s)/guard(s). - Guard(s). - New opening(s) in bearing wall(s) - New mechanical equipment on roof (note on Roof Framing Plan weight of each existing and new piece of equipment on the roof) - New equipment screening on roof - Any other structural alteration such as proposed area above the entry.See other red marks on the plans. Please resubmit the marked up set with revised and updated plans for recheck.