Loading...
HomeMy WebLinkAbout232360_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10193596 PROJECT ADDRESS: 1325 S Grand Ave PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/21/2017 INITIAL REVIEW 8/3/2017 EXPIRATION 1/17/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Viet Nguyen 3. TEL: (714)668-4260 FAX: VALUATION:$500,000.00 EMAIL: vnguyen@gparchitects.org FLOOD ZONE:X-0602320276J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceIt is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Per Section 11B-202.4 of CBC, the drawings submitted to the Building Division for review shall provide “…an accessible path of travel to the specific area of alteration or addition shall be provided. The primary accessible path of travel shall include”: - A primary entrance to the building and facility, - Toilet and bathing facilities serving the area, - Drinking fountain serving the area, - Public telephone serving the area, and - Signs.Valuation of proposed project is calculated as $ 500,000.00. A minimum of 20% of valuation of construction is required to be spent towards providing disabled access in the priority order noted in the immediate previous item as noted in CBC Section 11B-202.4 exception # 8. Revise the drawings to show compliance. Show both existing elements and how they will be upgraded to current standards.