HomeMy WebLinkAbout233438_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10193964 PROJECT ADDRESS: 4042 W Garry Ave PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK? OCCUPANCY CLASSIFICATION(S): H3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/24/2017 INITIAL REVIEW 8/30/2017 EXPIRATION 2/20/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Preston Neetzel 3. TEL: (714)481-0511 FAX: VALUATION:$30,000.00 EMAIL: pneetzel@pacflex.com FLOOD ZONE:X-0602320258J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments.This application is for placing a small storage container, 768 SF, on an existing site.However, the drawing shall show full compliance with requirements of CBC for the proposed application.Show full compliance with the requirements of Section 415 on the drawings.Show on the plans: - Occupancy Classification(s) of existing building and the proposed storage area. - Type of Construction - Fire Sprinkler for the proposed storage area. See CBC Section 415.4. Per Section 414.1.3 of CBC, Occupancies storing, handling, using, and/or selling hazardous materials, liquids, and chemicals shall submit report to the building official identifying the max. Expected quantities of hazardous materials to be stored, used in a closed system and used in open system… a list of all said materials, listing their quantities and how they relate to specific California Building Code Tables 307.1(1) and 307.1(2) items. Note on the Floor Plan, type and quantity of hazardous material in each control area and fire-resistive rating for fire barriers.Show compliance with CBC Section 415.6 for the proposed H3 Occupancy.Show compliance with the requirements of CBC Sections 506, 508 and Table 508.4 on the drawings.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Orange County Fire Authority approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuancePerchapter 10 of CBC. Exiting from any occupied point in a building or structure on the subject site must be continuous, unobstructed, and undiminished to a public way. This includes gates which must show compliance with CDB Section 1010. Clearly show compliance on the drawings.Provide on the drawings a complete door schedule, showing: - Door sizes - Hardware complying with exiting and disabled accessibility requirements - Show compliance with the City of Santa Ana’s Security Ordinance (Contact the Santa Ana Police Department Crime Prevention Section by telephoning 714-647-5840)Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”Provide specifications for doors hardware (i.e., lever type, push-pull panic, etc) to comply with disabled access requirements. The floor or landing at each side of an exit door shall be level and having a length in the direction of the door swing of at least 60” and the length opposite the direction of door swing of 44” as measured at right angles to the plane of the door in the closed position.Regardless of the occupant load, there shall be a floor or landing on each side of a door. The floor or landing shall be not more than ½” lower than the threshold of the doorway. Change in level between ¼” and ½” shall be beveled with a slope no greater than 1:2. Change in level greater than ½” shall be accomplished by means of a ramp. Provide detailed sections and plan views showing compliance at all doorways requiring accessibility.There seems to be a problem with the proposed door at east side of the proposed storage container.Hand-activated door opening hardware shall be centered between 34” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. The bottom 10” of all doors except automatic and sliding shall have a smooth uninterrupted surface to allow the door to be opened by a wheelchair footrest without creating a trap or hazardous condition.CBC Section 1008.2, Requires means of egress from all occupied parts of the building be provided with at least 1’ candle of light at floor level. Show compliance on the drawings.It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Chapter 11B: - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsEntrance(s) to the building or facility and primary path of travel to the specific area of new work, alteration, structural repair or addition shall be accessible. Path of travel incorporated all elements from the exterior arrival site to remodeled area.Walks, sidewalks, and pedestrian ways shall be free of gratings whenever possible. For gratings located in the surface of any of these areas, grid openings in gratings shall be limited to ½” in the direction of traffic flow.If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 11B-247.1.2.5.Show/note ventilation requirements on the plans in accordance with the CBC and California Mechanical Code (CMC) requirements for each type of use.This building is subject to the State of California Energy Conservation Regulations: - The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations (CCR,) Title 24, Par 6, 2016 California Energy Code. The plan check consultant must sign documentation certifying that a thorough, competent review has been performed on behalf of the Enforcement Agency. - The corrected/final ARCHITECTURAL drawings shall have the required energy efficiency compliance documentation with completed signature blocks filed on the plans. The same information may be copied on the Electrical Plans for the Electrical Plan Checker. - Refer to the attached information sheet.The submitted calculation is not clear. Calculations must be presented in a clear, legible, and organized manner conducive for structural plan review. Resubmit revised calculations showing compliance.A key plan must be provided for the structural members designed on all pages of calculations so that the calculations and plans may be correlated.A correlated grid system must be provided on the structural calculations and drawings to facilitate plan review process.Plan check stopped due to above items. Please resubmit the plans when all the above items are incorporated into the drawings.