HomeMy WebLinkAbout233184_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10193860 PROJECT ADDRESS: 2601 S Garnsey St PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, S-1? Proposed new occupancy? PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/17/2017 INITIAL REVIEW 8/28/2017 EXPIRATION 2/13/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Randy Orozco 3. TEL: (714)504-6470 FAX: VALUATION:$25,000.00 EMAIL: randy@rpodesigns.com FLOOD ZONE:X-0602320259J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.The drawings/information submitted for Building Safety Division review is not clear. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments.The information on the plans shall reflect NEW for the new work under this permit application such as: new “perimeter chain-link fence”, new: interior chain-link fence”, new “equipment”.The City records do not show “S-1” occupancy for this building. Is S-1 occupancy proposed under this building permit?The egress notes on sheets A1 & A2 shall be updated to comply with the 2016 CBC.Clearly indicate the scope of work under this building permit application: - Construction drawings must clearly show all work to be done under the subject building permit application. - Delete all notes and details from drawings that are not a part of the work to be done under the subject building permit application. This includes mechanical, plumbing and electrical work that is not specifically required by the Building Code.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Orange County Fire Authority approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceOccupancies storing, handling, using, and/or selling hazardous materials, liquids, and chemicals shall submit a list of all said materials, listing their quantities and how they relate to specific California Building Code Table items. Note on the Floor Plan, type and quantity of hazardous material in each control area and fire-resistive rating for fire barriers.Exiting from any occupied point in a building or structure on the subject site must be continuous, unobstructed, and undiminished to a public way. This includes gates which must show compliance with CDB Section 1010. Revise drawings to show compliance.Provide on the drawings a complete door schedule, showing: - Door/ gate sizes, - Hardware complying with exiting and disabled accessibility requirements.Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”Panic hardware shall comply with CBC Section 1010.1.10. Panic hardware shall be provided as required by CBC Section(s): - An Occupancy with an occupant count > 50. All doors/gates require a level floor landing on each side in accordance with CBC Chapter 11B. Provide typical door threshold details and details of change in floor covering material.The width of the level area on the side to which the door/ gate swings shall extend 24” past the strike edge of the door for exterior doors and 18” past the edge for interior doors.Provide specifications for doors/ gates hardware (i.e., lever type, push-pull panic, etc) to comply with disabled access requirements.The floor or landing at each side of an exit door/ gate shall be level and having a length in the direction of the door swing of at least 60” and the length opposite the direction of door swing of 44” as measured at right angles to the plane of the door in the closed position.Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors/ gates and interior doors/ gates, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. The bottom 10” of all doors/ gates except automatic and sliding shall have a smooth uninterrupted surface to allow the door to be opened by a wheelchair footrest without creating a trap or hazardous condition.It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Chapter 11B: - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarms