10193814
PROJECT ADDRESS:
940 W Santa Clara Ave
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/15/2017
INITIAL REVIEW
8/24/2017
EXPIRATION
2/11/2018
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Mark Wheeler
3.
TEL:
(562)856-5665
FAX:
VALUATION:$50,000.00
EMAIL:
markwheelerdesign@yahoo.com
FLOOD ZONE:X-0602320144JAll items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
-Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
Per CRC Section R302, Exterior walls, and roof overhang shall comply with the Table R302.1 (1). Dimension roof overhangs showing compliance with CRC R302. (Provide 1-hour on the underside of the roof overhang for the proposed addition.
Provide a fan for the new bathroom to comply with CRC Section R 303.3.1. (The fan shall have humidity control).
The plumbing notes on sheet A-3 shall be updated as marked on the drawings.
The building department notes on sheet A-3 shall be updated as marked on the drawings.
The detail 6/S2 does not represent the framing condition between existing and proposed addition. Revise this detail and submit the plans back for recheck.
The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (A106.1):
-All plumbing walls are to be framed with a minimum of 6" studs.
-Permissible notching and boring of joists are to be shown on the plans and shall not exceed CRC
allowances.
Show how dwelling is provided with comfort heating facilities capable of maintaining a room temperature of 68oF at a point of 3 feet above the floor in all habitable rooms. Provide a new heating system for the entire house, or justify that existing unit has capacity to cover the existing house plus the addition.
The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans.
-Signed Energy Efficiency Documents must be printed on the plans.
-Also, submit 2 copies of signed Energy Efficiency calculations.
-The permit applicant shall be responsible for obtaining an energy plan check from a consultant
who is qualified to perform an energy efficiency analysis in accordance with the California Code
of Regulations (CCR), Title 24, Part 1 (Administration) and Part 6 (2016 California Energy Code).
The plan check consultant must sign documentation certifying that a thorough, competent review
has been performed on behalf of the Enforcement Agency.
-The corrected/final drawings shall have the required energy efficiency compliance documentation
with completed signature blocks filed on the plans.
-The energy plan check consultant must sign documentation forms on behalf of the Building
Safety Division.
-The energy plan check consultant must also complete the attached “Energy Conservation
Plan Check Consultant Qualification Statement”.
Show underfloor ventilation opening size and locations equal to 1 sq. ft. for each 150 sq. ft. of underfloor area. Openings shall be as close to corners as practical and shall provide cross ventilation along the length of at least two opposite sides. Openings shall have ¼ inch corrosion resistant metal mesh covering.
Provide an under floor access for the proposed addition.