Loading...
HomeMy WebLinkAbout235231_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10194516 PROJECT ADDRESS: 3413 S Timber St PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/18/2017 INITIAL REVIEW 11/15/2017 EXPIRATION 4/16/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jorgelina Migliozzi 3. TEL: (949)697-7749 FAX: VALUATION: $31,571.00 EMAIL: giorgie@migliozzidesign.com FLOOD ZONE: X-0602320278JAll items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. All new construction, interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000, or when one or more sleeping rooms are added or created, the entire dwelling shall be provided with smoke detectors located as required for a new dwelling. (CRC R314.3) Smoke alarms shall be installed in all existing bedrooms and existing hallways. The residence shall conform to the State Energy Conservation Standards. Please complete signature block on Sheet A8-0. Architectural and structural drawings show vaulted ceiling plan with 2x6 RR, however T-24 energy calculations on Sheet A8-0 calls for 2x12. R-30 insulation is required to have 2x10 minimum RR’s. Revise to show compliance. Provide positive connection between existing and new roof ridge board/beam. Please refer to attached SB 407, provide a completed FORM on the drawings.