HomeMy WebLinkAbout234944_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10194418
PROJECT ADDRESS:
2907 N Bristol St
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/9/2017
INITIAL REVIEW
10/12/2017
EXPIRATION
4/7/2018
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Mike Flores
3.
TEL:
(562)415-3015
FAX:
VALUATION:
EMAIL:
glapm@gridalternatives.org
FLOOD ZONE:X-0602320144J
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.The original plan was approved by fire due to its deviation from the code requirements for clearances. The revised plan has to be reviewed and approved by fire.Identify on the plans what the changes are. As it stands, I am not sure what the changes are. You can use a delta or bubble and include a copy of the permitted set for reference.One of the plans with the review plan stamp by fire shows a 4’ clearance. The building plan show a 3-10” clearance.