PLAN CHECK NO:
10194722
PROJECT ADDRESS:
1724 W McEvoy Ln
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/9/2017
INITIAL REVIEW
11/16/2017
EXPIRATION
5/8/2018
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Greg Ayala
3.
TEL:
(714)408-8558
FAX:
VALUATION:$14,000.00
EMAIL:
Ayala@ahengineers.com
FLOOD ZONE:X-0602320144JAll items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
- Public Works Agency approval (647-5039).
-Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.Show all property lines of record on the Site Plan. Buildings shall not be constructed over any property line.Provide eave protection per requirements of CRC Section R302.1 &Table 302.1(1) for the East wall.For detail # 20/S-3, provide and call out a solid blocking under the holdwon.Detail # 1/S-2 is missing construction notes. Please see the red marks on this detail. Revise/complete this detail and resubmit for recheck.
Glazing in doors and enclosures for bathtubs and showers shall comply with CRC Section R908.
The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans:
-All plumbing walls are to be framed with a minimum of 6" studs.
-Permissible notching and boring of joists are to be shown on the plans and shall not exceed CBC
allowances.
-Notching of exterior and bearing/nonbearing walls shall not exceed 25%/40% respectively. Bored
holes in bearing/nonbearing walls shall not exceed 40%/60% respectively. In no case shall the
edge of the bored hole be nearer than 5/8 inch to the edge of the stud.
-All stud bearing walls are required to comply with the minimum requirements for load bearingwalls.
Show location(s) and provide typical construction details.
See other red marks on the drawings. Please resubmit the marked up set with revised drawings for recheck.