Loading...
HomeMy WebLinkAbout232910_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10193756 PROJECT ADDRESS: 3102 W Adams St PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/8/2017 INITIAL REVIEW 8/16/2017 EXPIRATION 2/4/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Joseph Alvarez 3. TEL: (323)273-8896 FAX: VALUATION:$20,000.00 EMAIL: tunatuna47@gmail.com FLOOD ZONE:X-0602320258J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Orange County Fire approval on the corrected/final sets of drawings ((714)573-6100) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceShow on the plans: - Occupancy Classification(s)for the proposed tank. - Type of Constructionfor the proposed tank.The structural design submitted for this tank is based on the Risk Category of II and Importance factor of 1.0 please verify these items vs. Table 1.5-1 and Table 1.5.2 of ASCE 7-10Compare the wind design loads for this tank when it is empty vs. seismic design when it is full.Page 5 of the calculation calls for safety factor of 1.0 for overturning and sliding. Please update these to minimum of 1.5.See other red marks on the drawing. Please resubmit the marked up set with updated plans for recheck.