PLAN CHECK NO:
10294374
PROJECT ADDRESS:
506 E Washington Ave
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/3/2017
INITIAL REVIEW
10/31/2017
EXPIRATION
4/1/2018
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Luis Soto
3.
TEL:
(858)437-4247
FAX:
VALUATION: $85,000.00
EMAIL:
luis@lsrbuilders.com
FLOOD ZONE: X-0602320163J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
- Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
Scale of Drawings must be large enough to insure legibility.
Delete notes and details that do not apply to this project.
The project owner/developer shall designate a contact person who has the authority to act on behalf of the owner to coordinate and provide consistency for all of the plans required for the project including landscaping, grading, pedestrian protection, architecture, structural, electrical, mechanical and plumbing. On the drawings note the contact person's name, position, address and telephone number. (CBC 107.1 and 107.3.4.1)
Prior to the issuance of building permit(s), tract maps, parcel maps, lot line adjustments, public way abandonments, covenant, conditions and restrictions (CC&R's), etc., related to the subject project must be legally recorded with the County of Orange.
Sheet C1.0Provide one-hour fire rating details for exterior walls where the proposed garage is less than 5 feet from the property line.Specify occupancy group: “R-3/U” under Tabulations.Specify sprinkler: “Yes or No?” under Tabulations.Show North arrow direction on the plot plan.Specify “new proposed garage” under scope of work.Sheet D1.0Please fix drawing on wall lines in CAD file. See plans for location.