HomeMy WebLinkAbout235537_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10194614 PROJECT ADDRESS: 1700 E Seventeenth St Unit# C PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/27/2017 INITIAL REVIEW 11/2/2017 EXPIRATION 4/25/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Sara Shishani 3. TEL: (714)746-7189 FAX: VALUATION:$19,000.00 EMAIL: sara@marvistaconstruction.com FLOOD ZONE:X-0602320164J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment, when needed. All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. A separate sheet for response may be used.Please refer to remarks on the drawings for additional plan check comments. Revise drawings to show compliance with 2016 CBC. This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 714-647-5800 for information. Please remove electrical, mechanical and plumbing sheets.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) (When door is proposed) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - It is the project designer’s responsibility to coordinate work with the various trades to ensure that the size of the wall cavity will be large enough to accommodate piping, fittings, ducts, etc. There has been a continuing field problem of 2½” wide metal studs not being able to accommodate plumbing pipes. - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Sheathing material and details of attachment. Note type, size, and spacing of fasteners. - Heights of partition, suspended ceiling, structure above. - Fire-blocks and draft-stops in combustible construction in accordance with CBC Section 717. Show location(s) and provide typical construction details.(When fire damaged) Show/note ventilation requirements on the plans in accordance with the CBC and California Mechanical Code (CMC) requirements for each type of use. Note on drawings: - Provide mechanical ventilation for each area/room in accordance with the 2016California Mechanical Code. Note on drawings: Show/note LIGHTING requirements on the plans in accordance with CBC and California Electrical Code requirements for each type of use. It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards. City of Santa Ana does not have jurisdiction to enforce ADA compliance and it is the responsibility of designer. Remove notes referring to ADA compliance on the drawings. This project is reviewed for compliance with 2016 CBC. Provide drawings to show compliance with following items; (Identify new and existing door and windows on the drawings) All building entrances that are accessible to and usable by persons with disabilities shall be identified with a least one standard sign and with an additional directional signs, as required, to be visible to persons along approaching pedestrian ways. Please refer to red marks on the drawings for ramp and truncated dome; Provide truncated dome detail in compliance with 2016 CBC. If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 704 of 2016 CBC. Identify zero curb areas between building entrance area and parking and provide truncated dome. The 6” high walkway, landscaping areas to be identified on the drawings for Detectable Warning Product Approval. Only approved Division of the State Architect, Access Compliance (DSA/AC) approved.Tactile exit signs shall be required at the following locations: Provide sign elevation in compliance with 703.3- Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.”