Loading...
HomeMy WebLinkAbout234128_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10194177 PROJECT ADDRESS: 1509 W Second St PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/18/2017 INITIAL REVIEW 10/13/2017 EXPIRATION 3/17/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Loyd Van Dao 3. TEL: (949)252-0829 FAX: VALUATION: $0.01 EMAIL: FLOOD ZONE: X-0602320257J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. -In addition to other fees, a "Park Acquisition and Development Fee" in the amount shown below shall be required pursuant to a resolution of the City Council for the Recreation and Community Services Agency; net addition of ________ bedroom(s).Amount of $6,622.22; net addition of 5 bedroomsAmount of $5,952.18; net addition of 4 bedroomsAmount of $5,375.50; net addition of 3 bedroomsAmount of $4,006.57; net addition of 2 bedroomsAmount of $3,006.99; net addition of 1 bedroom Scale of Drawings must be large enough to insure legibility. Delete notes and details that do not apply to this project. Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper. Delete notes and details that do not apply to this project. (CBC 107) New one- and two-family dwellings and townhouses shall have an automatic fire sprinkler system installed in accordance with CRC Section R313.3 or NFPA 13D. Contact the Santa Ana Fire Department for fire sprinkler permit requirements (714) 647-5839. (CRC R313) Specify finish floor elevation of first floor. (CBC 107.2.5) Prior to the issuance of building permit(s), tract maps, parcel maps, lot line adjustments, public way abandonments, covenant, conditions and restrictions (CC&R's), etc., related to the subject project must be legally recorded with the County of Orange. TITLE SHEETShow the complete legal description and assessor's parcel number on the plans.The address of the building, and the name and address of the owner(s) and person(s) preparing the plans are required on the first sheet of the plans. (CBC 107)Include address and telephone number of the responsible designer and date of signing of drawings. Provide building information on plans: - Occupancy type: R3 / U - Construction type: Type V – B - Fire sprinklered: Yes / No - Fire sprinkler type:(where applicable)Provide complete project description with detailed description of scope of work.Note on the Drawings: - Number of stories: - Existing building area: - New building area: - Area of existing garage: - Area of new garage: Provide a statement on the title sheet of the plans that this project shall comply with following codes: - 2016 California Residential Code (CRC) - 2016 California Building Code (CBC) - 2016 California Electrical Code (CEC) - 2016 California Mechanical Code (CMC) - 2016 California Plumbing Code (CPC) - 2016 California Green Building Standards Code (CGBS) or CALGreen - 2016 California Energy Code (CEnC) - City of Santa Ana Municipal Code List all deferred submittals on cover sheet. (CRC R106.3.3) Provide and show on the plans, house street number visible and legible from street. (Minimum 4”High x 1” Wide) CRC R319 Add a note on the cover sheet: “Separate permit(s) is/are required for accessory building, landscape, patio covers, fences, swimming pool, retaining walls, demolition, etc.” SITE PLANShow all property lines of record on Site Plan. Buildings shall not be constructed over any property line. Show the North arrow on the plans and centerline of labeled street(s) and alley. Provide building setbacks to finish of exterior walls to all property lines. Provide eave / overhang / projection setback to all property lines.Projections of dwelling units and accessory buildings without an automatic residential fire sprinkler protection are not permitted less than 2 feet to the property line and are required to be 1 hour fire rated on the underside with a fire separation distance between 2 feet and 5 feet. (CRC Table R302.1 (1)) Walls of dwelling units and accessory buildings without an automatic residential fire sprinkler protection with a fire separation distance less than 5 feet are required to have a full one hour rating. (CRC Table R302.1 (1)) Openings are not permitted less than 3 feet to the property line. In dwelling units and accessory buildings without an automatic residential fire sprinkler protection openings are limited to 25 percent the wall area when fire separation distance is greater than 3’ and less than 5’. (CRC R302.1 (1)) Provide existing and proposed contours/spot elevations to indicate general site slope and drainage pattern. (CBC 107) Lots shall be graded to drain surface water away from foundation walls. The grade shall fall a minimum of 6 inches within the first 10 feet. (CRC R401.3) FLOORPLANShow 30-inch clear width for water closet compartments and 24-inch clearance in front of a water closet. Show location of heating equipment on the plans. (CRC R303.8)Carbon monoxide alarms combined with smoke alarms shall comply with both sections R314 and section R315, all applicable standards, and requirements for listing and approval by the Office of the State Fire Marshal, for smoke alarms.All new construction, interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000, or when one or more sleeping rooms are added or created, the entire dwelling shall be provided with smoke detectors located as required for a new dwelling. (CRC R314.3) Smoke alarms shall be installed in the following locations: - In each sleeping room. - Outside each separate sleeping area in the immediate vicinity of the bedrooms. - On each additional story of the dwelling, including basements and habitable attics but not including crawl spaces and uninhabitable attics. In dwellings or dwelling units with split levels and without an intervening door between the adjacent levels, a smoke alarm installed on the upper level shall suffice for the adjacent lower level provided that the lower level is less than one full story below the upper level. - When more than one smoke alarm is required to be installed within an individual dwelling unit the alarm devices shall be interconnected in such a manner that the actuation of one alarm will activate all of the alarms in the individual unit.Exception: Interconnection is not required in existing dwelling units where repairs do not result in the removal of wall and ceiling finishes, there is no access by means of attic, basement or crawl space, and no previous method for interconnection existed.All new construction, Interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000,, an approved carbon monoxide alarm shall be installed in dwelling units and in sleeping units within which fuel-burning appliances are installed and in dwelling units that have attached garages shall be provided with carbon monoxide alarms (CRC R315) - Carbon monoxide alarms shall only be required in the specific dwelling unit or sleeping unit for which the permit was obtained. Carbon monoxide alarms required by Sections R315.1 and R315.2 shall be installed in the following locations: ________. - Outside of each separate dwelling unit sleeping area in the immediate vicinity of the bedroom(s). - On every level of a dwelling unit including basements. - Where more than one carbon monoxide alarm is required to be installed within the dwelling unit or within a sleeping unit the alarm shall be interconnected in a manner that activation of one alarm shall activate all of the alarms in the individual unit. Exception: Interconnection is not required in existing dwelling units where repairs do not result in the removal of wall and ceiling finishes, there is no access by means of attic, basement or crawl space, and no previous method for interconnection existed.For an FAU located in the attic provide a minimum access of 22 x 30 inches, a 24-inch wide walkway, a 30-inch deep work platform, and electric light outlet adjacent to the furnace and switched by the opening. (CMC 904.11 & 305)Shower compartments and walls above bathtubs with shower heads installed shall be finished with a smooth, nonabsorbent surface to a height of not less than 72” above the floor. (CRC R307.2)For each enclosed attic space with a maximum vertical height greater than 30 inches, provide a minimum of 22 x 30 inches attic access. (CRC R807.1) Interior spaces intended for human occupancy shall be provided with heating facilities capable of maintaining a room temperature of 68 degrees Fahrenheit at a point 3 feet above the floor and 2 feet from exterior walls in all habitable rooms. (CRC R303.8) ROOF CONSTRUCTION AND COVERINGProvide detail of roof construction assembly. (CRC 902.1) Specify ICC approval number and weight per square foot for tile and special roof coverings. (CRC R905.3.4 and R905.3.5) Provide cross ventilation for attic and each enclosed rafter space as specified in CRC Section R806. Callout attic vent locations, sizes and types on plans. Provide attic ventilation calculation to show minimum ventilation is provided. (CRC R806.2)The total net free ventilating area shall not be less than 1/150 or 1/300 when a Class I or II vapor barrier is installed on the warm-in-winter side of the ceiling. (CRC R806.2) The total net free ventilating area shall not be less than 1/300 when at least 50% and not more than 80% of the required ventilating area is provided by ventilators located in the upper portion of the space to be ventilated at least 3 feet above the eave or cornice vents with the balance of the required ventilation provided by eave or cornice vents. Show high/low vent locations on plans. (CRC R806.2)