Loading...
HomeMy WebLinkAbout236433_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10194919 PROJECT ADDRESS: 200 E Sandpointe Ave PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: II A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/28/2017 INITIAL REVIEW 12/4/2017 EXPIRATION 5/27/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jay Hennessey 3. TEL: (949)257-9184 FAX: VALUATION:$30,000.00 EMAIL: jay_hennessey@emcorgroup.com FLOOD ZONE:X-0602320278J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.This review does not include mechanical, plumbing, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide full construction details on the drawings and supporting structural calculation to show that new cooling tower will be secured to existing steel framing to transfer all the loads, vertical and lateral loads; from the proposed tower to existing framing. Detail 1 on sheet S-1.1 is not adequate.Also, the structural details which are part of calculation, drawing # 61437-1C;shall be added to these sets of plans for issuance of building permit.Please add a note on the drawings to reads any fire proofing that get damaged due to replacement of this cooling tower will be fixed before this job is final.Provide a list of all special inspections required under CBC Section 1705 on the drawings.