Loading...
HomeMy WebLinkAbout236219_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10194843 PROJECT ADDRESS: 200 E Sandpointe Ave Unit# 150 PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: II A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/16/2017 INITIAL REVIEW 11/22/2017 EXPIRATION 5/15/2018 RECHECKS: 1. 12/06/2017 PROJECT APPLICANT CONTACT PERSON: 2. Randall S Patrick 3. TEL: (949)724-1499 FAX: (949)724-1877 VALUATION:$333,700.00 EMAIL: rand@spaces-oc.com FLOOD ZONE:X-0602320278J The recheck of your drawing was completed this morning and the drawing is approved for building permit issuance subject to items 2 and 3 from the list below. The drawing is placed at the plan check counter for your convenience. APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSResubmit 2corrected sets of plans.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance.Sanitary facilities serving the area of new work shall be disabled accessible. The maneuvering space/ clearance on the pull side for the door to accessible women’s toilet compartment shall be min of 60”per CBC Sections 11B-604.8.1.2 & 11B404.2.4.1. Drawing is not very clear in this area. Please provide this dimension on the drawings. See red marks on sheet RR-1.Hand-activated door opening hardware shall be centered between 34” and 44” above the floor. Please make a note on the drawing for this requirement.The recheck could be done over the counter. Please call to make an appointment for over the counter rechecks.