HomeMy WebLinkAbout237562_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10195290 PROJECT ADDRESS: 515 E Dyer Rd PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/10/2018 INITIAL REVIEW 1/19/2018 EXPIRATION 7/9/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Daniel Harper 3. TEL: (561)400-8075 FAX: VALUATION:$75,000.00 EMAIL: Dan. Harper@Hines.com FLOOD ZONE:X-0602320278J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please re-submit 3 sets of revised/ corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.- Police Department approval on the corrected/final set of drawings (647-5840) (If exterior door modification) - Public Works Agency approval (647-5039). . - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceValuation of proposed project is calculated as $75,000.00. A 20% of valuation of construction is required to be spent towards providing disabled access in the priority order noted in the immediate previous item as noted in CBC Chapter 11-B, Division 2. Show both existing elements and how they will be upgraded to current standards.Please refer to attached hardship Form and provide a completed and signed copy on the drawings as well as an original to be submitted with revised drawings to Building department. Drawings to show accessibility compliance with Division 2, Chapter 11B of 2016 CBC. Provide specific accessibility details to show compliance with followings: - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Parking, signage and alarms 9. Please see next two pages for DSA policy on Seismic upgrade for exiting building.