Loading...
HomeMy WebLinkAbout237727_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10395337 PROJECT ADDRESS: 3132 W Adams St PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): F-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/18/2018 INITIAL REVIEW 3/19/2018 EXPIRATION 7/17/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Valentin Rodriguez 3. TEL: (714)780-3837 FAX: VALUATION:$12,000.00 EMAIL: Vrodriguez@cafueling.com FLOOD ZONE:X-0602320258J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSteel storage racks and their anchorage, located inside the sales area or areas where the public are allowed in must be designed using an importance factor of1.5 inaccordance with Section 15.5.3 of ASCE 7. "The rack design loads will be posted on a 50 sq. in plaque, showing the maximum unit load and/or uniform load per level, the average unit load, and maximum load per bay. The unit load is usually a single pallet or container and its contents mechanically transported. It is the owner's responsibility to insure the rack system is not altered to invalidate the plaque." (Rack Manufacturers Institute Sec. 1.4.2) Calcs provided are for racks with two levels. Provide calcs for those with three levels.Specify the type of product that will be stored on the shelves.Dimension the distance between the rack the structure behind. Please see comments on the plans.