Loading...
HomeMy WebLinkAbout237088_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10195142 PROJECT ADDRESS: 1921 E Alton Ave Unit# 100 PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/21/2017 INITIAL REVIEW 1/9/2018 EXPIRATION 6/19/2018 RECHECKS: 1. 02/05/2018 PROJECT APPLICANT CONTACT PERSON: 2. Rick Martin 3. TEL: (949)851-3044 FAX: (949)851-3985 VALUATION:$50,000.00 EMAIL: Beck-Martin@sbcglobal.net FLOOD ZONE:X-0602320278J The recheck of your drawing was completed this morning, 02/05/2018; and the drawing was approved for building permit issuance subject to item # 2 from the list below. Approved plans are located at the plan check counter for your convenience. APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSResubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuancePlease update the code editions on structural drawing, sheet S1.1, from 2013 to 2016 codes.The “Risk Category” under General Requirements summary of work on sheet S1.1 shall be verified by the design engineer. If the risk category IV is selected for this design, then the correct “Importance Factor” shall be used in the calculation package per ASCE7-10. Please verify this and update the sheet S1.1 or the structural calculation.