HomeMy WebLinkAbout237088_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10195142
PROJECT ADDRESS:
1921 E Alton Ave Unit# 100
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862FAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/21/2017
INITIAL REVIEW
1/9/2018
EXPIRATION
6/19/2018
RECHECKS:
1. 02/05/2018
PROJECT APPLICANT CONTACT PERSON:
2.
Rick Martin
3.
TEL:
(949)851-3044
FAX:
(949)851-3985
VALUATION:$50,000.00
EMAIL:
Beck-Martin@sbcglobal.net
FLOOD ZONE:X-0602320278J
The recheck of your drawing was completed this morning, 02/05/2018; and the drawing was approved for building permit issuance subject to item # 2 from the list below.
Approved plans are located at the plan check counter for your convenience.
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSResubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuancePlease update the code editions on structural drawing, sheet S1.1, from 2013 to 2016 codes.The “Risk Category” under General Requirements summary of work on sheet S1.1 shall be verified by the design engineer. If the risk category IV is selected for this design, then the correct “Importance Factor” shall be used in the calculation package per ASCE7-10. Please verify this and update the sheet S1.1 or the structural calculation.