Loading...
HomeMy WebLinkAbout238524_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10195575 PROJECT ADDRESS: 1921 E Alton Ave Unit# 100 PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 2/15/2018 INITIAL REVIEW 2/26/2018 EXPIRATION 8/14/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Rick Martin 3. TEL: (949)851-3044 FAX: (949)851-3985 VALUATION:$348,000.00 EMAIL: Beck-Martin@sbcglobal.net FLOOD ZONE:X-0602320278J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSThe recheck of your project could be done over the counter with an appointment. Please call 717-647-5862 to set up an appointment when the following items are incorporated into the drawings.Resubmit 3corrected sets of plans.Per Section 1010.1.9.3 of CBC, the note # 2, under DOOR NOTE, on sheet A-1 shall be modified to read:”… this door to remain unlocked when the space is occupied”. On sheet A-5, provide a cross reference for the exterior door on the Eastside to be removed.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance