Loading...
HomeMy WebLinkAbout238920_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10195706 PROJECT ADDRESS: 1313 W Warner Ave PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 2/28/2018 INITIAL REVIEW 3/9/2018 EXPIRATION 8/27/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Elhamy Bakr 3. TEL: (818)618-2897 FAX: VALUATION:$73,379.00 EMAIL: loftigc@gmail.com FLOOD ZONE:X-0602320259J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.Include address and telephone number of the responsible designer, and date of signing of drawings.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Provide the following: - Provide a fully dimensioned site plan on each set of plans. - Disabled access compliance must be shown on the site plan.Indicate detail and section references as to their appropriate location.Show existing floor plan for unit 1313 and 1315 and show which demising wall is being removed.Reference each fire-resistive assembly to a CBC Chapter 7, Table and Item number: - ShaftsProvide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Provide on the drawings details for the lateral support of partitions, rails and similar space dividers less than 5’ 9” in height. - Sheathing material and details of attachment. Note type, size, and spacing of fasteners. - Heights of partition, suspended ceiling, structure above.Complete all soffit and furred out wall details. Provide complete detailing, including number, type, location of fasteners and how attachment is made to the building structure. Show compliance with CBC Section 803.Sheet 1/K4 and 4/K6 , referenced on sheet K1 are not found.Please identify € store front from (N) store front, referenced on sheet A1.Tactile exit signs shall be required at the following locations: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit door that leads directly to a grade-level exterior exit by means of an exit enclosure, or an exit passageway, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B/Chapter 11B: - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsShow all the clearances per 11B-603.Provide minimum 60 inch clearance at the front of toilet in bathroom #2. Provide complete path of travel from parking to the entrance , including curb ramp, truncated dome,…Show complete path of travel to the Walk in cooler.Provide 60 inch clear landing at the Walk in cooler door.Provide minimum 6’-6” high door for the Walk in cooler.Show employee locker is in compliance with accessibility.Provide minimum 12” clearance to the strike edge of Exit door # 2.If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 1133B.8.5. Detectable Warning Product Approval. Only approved Division of the State Architect, Access Compliance (DSA/AC) approved detectable warning products and directional surfaces shall be installed in accordance with CBC Section 1133B.8.5.CBC Section 1607.7. Provide complete grab bar details on the drawings showing compliance with CBC Section 1115B.8 including structural strength to support a 250 pound point load.All dining, banquet, and bar facilities shall be made accessible to persons with disabilities as provided in CBC 2016 chapter 11B. At least 5%, but not less than one of the seating spaces in each functional area is accessible as follows: - Provide a minimum 30” x 48” wheelchair clear floor space. - Provide knee space at tables at least 27” high, 30” wide and 19” deep. - Provide height of tables between 28” – 34” from the floor ground. - Provide access to accessible seating space(s) by aisles with a minimum of 36” in width.(Provide minimum 60 inch wide at the counter)CBC Section 1110B.1.3, Check Stands CBC Table 11B-2: NUMBER OF REGULARNUMBER TO BE CHECKSTANDSACCESSIBLE 1 to 41 - In new and existing construction, accessible check stands shall provide a clear checkout aisle width of 36” with a maximum adjoining counter height not exceeding 38” above the finish floor. - The top of the counter lip shall not exceed 40” above the finish floor. - Accessible check stands shall always be open to customers with disabilities and shall be identified by a sign clearly visible to those in wheelchairs. The sign shall display the international symbol of accessibility in white on a blue background and shall state “This check stand to be open at all times for customers with disabilities.”This building is subject to the State of California Energy Conservation Regulations: - The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations (CCR,) Title 24, Par 6, 2016 California Energy Code. The plan check consultant must sign documentation certifying that a thorough, competent review has been performed on behalf of the Enforcement Agency. - The corrected/final ARCHITECTURAL drawings shall have the required energy efficiency compliance documentation with completed signature blocks filed on the plans. The same information may be copied on the Electrical Plans for the Electrical Plan Checker.- The energy plan check consultant must complete the attached “Energy Conservation Plan Check Consultant Qualification Statement.”Provide complete framing detail for bathroom ceiling.Provide complete structural calculations and drawings for suspended ceiling systems showing compliance with CBC Sections 711.3.1, 803.9, 1613, and 1705 (special inspections) and ASTM C635 and ASTM C636.Provide a complete suspended ceiling system plan and section detail showing the following: - Vertical supports - Seismic wires - Seismic strut/Compression strut - Perimeter wires - Separate fixture wires for lights and mechanical devices - ICC Research Report number for the suspended ceilingThe reflected ceiling plan and details must show compliance with CBC Sections 711.3.1, 803, 1613, and 1705 (special inspection) for suspended ceiling systems.Note ICC Research Report Number on the drawings for the suspended ceiling system. (ICC Report Number 1308)Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for: - Storage racks over 8’ high - New mechanical equipment on roof (note on Roof Framing Plan weight of each existing and new piece of equipment on the roof) - Structural support of shaft(s) and/or hood(s)Provide weight of the new compressor on the roof, provide attachment detail for the unit, units over 200 lb provide calculation. Show size of the new opening at the roof for the compressor.Show height of the shelving, for shelving over 6 fthigh, provide attachment detail.Provide complete calculation and construction detail for Walk in Cooler (lateral and vertical).Provide complete calculation and construction detail for type I hood.Please fillout attached disabled compliance form.