HomeMy WebLinkAbout236768_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10295027 PROJECT ADDRESS: 514 N Eastwood Ave PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/11/2017 INITIAL REVIEW 1/29/2018 EXPIRATION 6/9/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. John Wu 3. TEL: (626)293-1001 FAX: VALUATION: $15,000.00 EMAIL: wususi@yahoo.com FLOOD ZONE: X-0602320276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3 corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. Delete notes and details that do not apply to this project. (CBC 107)Sheet 1Provide energy document on proposed window replacement. Specify minimum u-factor and solar heat gain coefficient on the plan.Specify square footage of covered patio and covered roof area on the second floor.Cross reference “area of work” to sheet 3 on the floor plans.Sheet 2 On the West elevation, specify minimum headroom clearance of 6’-8”.On detail C, the depth of footing shows 12 inches. However, foundation note indicates 18 inches deep footing. Verify design.On detail 4, specify blocking to header connection.On detail 3, specify edge distance and bolt spacing.On detail 3, specify hanger type from the roof rafter to the roof eave.On detail 3, specify blocking to ledger detail.Sheet 3Covered roof framing plan shows 42 inches-high guard rail. Specify existing guard rail or provide details on proposed guard rail.On detail 1, specify boundary nailing spacing on roof sheathing.Detail 1 shows “existing” roof. Plan shows new framing area per detail one. Verify design.