PLAN CHECK NO:
10196086
PROJECT ADDRESS:
2417 S Linda Way
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
4/10/2018
INITIAL REVIEW
5/7/2018
EXPIRATION
10/7/2018
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Ha Nguyen
3.
TEL:
(714)326-3124
FAX:
(714)554-4025
VALUATION: $30,000.00
EMAIL:
win.nguyen.ent@gmail.com
FLOOD ZONE: X-0602320259J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper. Fireblocking is required in concealed spaces 10’ o.c. horizontal, vertically at the ceiling and floor levels, connections between horizontal and vertical spaces, concealed spaces between stair and landing, openings around vents, pipes, ducts, cables, wires, chimneys and fireplaces. (CRC R302.11)
Submit engineering calculations for vertical and lateral loads prepared by a registered Civil, Structural Engineer or Architect. Additional Structural Corrections may apply.
Provide a minimum of two No. 4 bars at top and at bottom of continuous footing. Note on drawings: "Truss supplier shall submit calculations and shop drawings signed by a registered civil engineer to the responsible project designer who agrees to review the shop drawings for acceptance prior to fabrication. Shop drawings and calculations shall be submitted to the Building Safety Division for acceptance after the responsible project designer has noted his/her acceptance and prior to fabrication.”
Truss drawings must reflect compliance with CBC Sections:
-Plans, structural calculations, and specifications must be prepared by a California registered civil
engineer. (A106.1)
-Regulation of prefabricated construction including required inspections and certifications. (1703.6)
-Metal-plate-connected wood trusses shall conform to CBC Section 2303.4. Provide evidence of
required fabrication, storage, handling and delivery inspections.
-When bearing studs are spaced at 24-inch intervals and top plates are less than two 2-inches by
6-inches, and when trusses are spaced at more than 16” intervals, such trusses shall bear within 5” of the studs beneath or a third top plate shall be installed. (2308.9.2.2)
- Note: If the responsible project designer declines to agree to review shop drawings, complete
structural calculations and drawings for trusses shall be submitted for review and acceptance by the
Building Safety Division prior to issuance of permits for the subject project.
Clearly identify all design assumptions & load criteria on the plans. As a minimum:
- Dead Loads of roof/ceiling, floors, exterior/interior walls (R301.2.2.2.1);
- Live Loads for roof, attics with limited storage, attics without storage, habitable attics and attics
served with fixed stairs, floors, and balconies/decks, and stairs per Tables R301.5 & R301.6;
- Wind Loads per Section R301.2.1and wind exposures per Section R301.2.1.5;
- Seismic Loads per Section R301.2.2;
- Local Jurisdiction Design Criteria per Table R301.2(1)
Provide manufactured roof truss profiles, layout plan and calculations from truss manufacturer.
Indicate on the plans the design dead and live load for which the trusses are to be designed. The weight and location of all mechanical equipment shall be indicated on the roof framing plans. Drag loads of drag trusses shall be indicated on plans. Note on the plans "Trusses are a deferred submittal item. Truss plans and calculations shall be submitted to the engineer of record for review and to the building department for approval. The engineer of record shall indicate that the design has been reviewed before submitting to the building department. The truss design shall be approved by the building department before the trusses are installed."
Detail connection of the top of interior non-bearing walls to manufactured trusses.
For plywood roof and floor diaphragm specify thickness, grade, T&G edges, panel span rating, nailing schedule and required blocking and panel layout pattern.
Provide details for retrofit shear and tension anchor bolts on plans. Provide calculations as needed
Specify on the framing plans the shear wall material, thickness, size and spacing of fasteners and sole plate nailing. Call out anchor bolt spacing and hold down hardware on foundation plan.
Show location of underfloor access.
Since existing shearwalls are removed on 2 directions, please also consider required shear wall for existing house in the calculation.
On roof plan show the existing roofs that are being removed.
Provide detail to show the shear integrity will be provided, from new roof to existing and altered roof.
Provide calculation to justify 4x6 header.
Please fillout attached SB-407 form and copy it on the drawings.