HomeMy WebLinkAbout240782_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10196221
PROJECT ADDRESS:
2601 S Garnsey St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812FAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
B, F-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
4/23/2018
INITIAL REVIEW
5/5/2018
EXPIRATION
10/20/2018
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Randy Orozco
3.
TEL:
(714)504-6470
FAX:
VALUATION:$60,000.00
EMAIL:
randy@rpodesigns.com
FLOOD ZONE:X-0602320259J
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Submit a letter addressed to the Building Safety Division describing in detail the manufacturing process from material delivery, storage, handling, packaging, and shipping of finish product. Include an equipment list describing use in the process.Please enlarge path of travel to show compliance with accessibility.EXIT ACCESS. That portion of a means of egress system that leads from any occupied portion of a building or structure to an exit. CBC Sections 1002 and 1014.Table 1019.2 For Buildings With One Exit:Maximum HeightMaximum OccupantsOf Building(Or Dwelling Units)OccupancyAbove Grade PlanePer Floor And Travel Distance
A, B, E, F, M, U1 Story49 occupants and 75’ travel distance
H-2, H-3, L1 Story3 occupants and 25’ travel distanceProvide 2 exits for the cleanroom.Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for:
- New mechanical equipment on roof (note on Roof Framing Plan weight of each existing and new piece of
equipment on the roof)
- New equipment screening on roofJustify how 2x4 could carry additional load from the screen.How could detail 6/9 supported by 2x4.Please verify if there is any spray booth per Engineer statements, if there is shoe the location and provide ICC report for Pre-fab spray booth and provide complete structural drawings for custom built with OCFA approval.Provide complete construction and framing detail with engineer stamp for the clean room, show how it is supported laterally.Provide ICC report and span table for the panels in Dry room.ICC report ESR 3056 on sheet 7 is for Masonry, provide ICC report for anchorage in crack concrete.Please revisit detail 5/8 detail doesn’t match the location.Show connection of the member above on the Air handler platform.For the roof screen show how the panel on sheet 2/ 9, metal sheet could span per detail 3/9 , without any support and attachment.Please fillout attached disabled compliance form.