HomeMy WebLinkAbout236978_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10195100
PROJECT ADDRESS:
1951 E Dyer Rd
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
I B
OCCUPANCY CLASSIFICATION(S):
A-3, S-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/7/2018
INITIAL REVIEW
5/7/2018
EXPIRATION
11/3/2018
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
R.C. Alley III
3.
TEL:
(714)639-9860
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:X-0602320278J
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2 corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment. The design engineer need to review and approve the Geopier plans.Since there is no positive connection between the piers and the footing, please clarify how the lateral is being resisted at the foundation level. Please clarify if friction alone is going to be adequate to support all the lateral load.Provide copies of the design of the concrete spread footing that is supported by the point load of the pier. The conversional method of assuming the soil as an elastic foundation does not seem appropriate,Provide evidence for compliance with the ICC report item 5.2 regarding the qualification of the geopier installer.Specify the ICC report on the plans.Add a statement to indicate that special inspection is required and the qualification of the special inspector.