HomeMy WebLinkAbout242214_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10196622
PROJECT ADDRESS:
1921 E Alton Ave
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862FAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
A-2, B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/4/2018
INITIAL REVIEW
6/19/2018
EXPIRATION
12/1/2018
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Alan Hernandez
3.
TEL:
(949)701-4248
FAX:
VALUATION:$30,000.00
EMAIL:
ahernandez@lpainc.com
FLOOD ZONE:X-0602320278J
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSResubmit 2corrected sets of plans.This review does not include fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide on the drawings a complete door schedule, showing:
- Door sizes
- Hardware complying with exiting and disabled accessibility requirements
- Show compliance with the City of Santa Ana’s Security Ordinance (Contact the Santa Ana Police Department
Crime Prevention Section by telephoning 714-647-5840)Provide a note on the drawings to show compliance with all 8 conditions under CBC Section 1010.1.4.3.Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”Provide specifications for doors hardware (i.e., lever type, push-pull panic, etc) to comply with disabled access requirements. Regardless of the occupant load, there shall be a floor or landing on each side of a door. The floor or landing shall be not more than ½” lower than the threshold of the doorway. Change in level between ¼” and ½” shall be beveled with a slope no greater than 1:2. Change in level greater than ½” shall be accomplished by means of a ramp. Provide detailed sections and plan views showing compliance at all doorways requiring accessibility.Hand-activated door opening hardware shall be centered between 34” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. The bottom 10” of all doors except automatic and sliding shall have a smooth uninterrupted surface to allow the door to be opened by a wheelchair footrest without creating a trap or hazardous condition.