PLAN CHECK NO:
10196355
PROJECT ADDRESS:
3330 S Harbor Blvd
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830FAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
B, F-1, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/7/2018
INITIAL REVIEW
5/16/2018
EXPIRATION
11/3/2018
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Debra Pember
3.
TEL:
(714)334-8385
FAX:
(949)265-6959
VALUATION:$50,000.00
EMAIL:
debra@developersedge.com
FLOOD ZONE:X-0602320258JINSTRUCTIONS:
Numbersinbracketsrefertocodesectionsof 2016CaliforniaBuilding Code[CBC],2016CaliforniaPlumbingCode[CPC],2016CaliforniaMechanicalCode[CMC],2016California ElectricalCode[CEC],2016CaliforniaEnergyCode(2016BuildingEnergyEfficiencyStandards[BEES]),and2016 CaliforniaGreenBuildingsStandardsCode[CalGreen]
Correctoriginaldrawings.Reprintandsubmit3newsetstogetherwiththe“marked-up”set.Returnthiscorrections list with corrected plans.
In the Item number column, ☒ in the checkbox represents correction requested.
IntheRespondcolumn,pleaseindicatethesheetnumberanddetailornote numberontheplanwherethe corrections are made.
Itemize anychanges,revisions,oradditions madeto drawingsthatarenotadirectanswertoa correctionona separate sheet.
Additionalplancheckfeewill be requiredafterthirdreviewonhourlyrate basis.
ADDITIONALCORRECTIONS:
Item #
Sheet #
Corrections Requested
Respond
☒
A1.2, A2.2
Sheet A0.3, A1.2 and Sheet A2.2 shows a “Mezzanine” floor plan. It appears the intended design on the second floor tenant improvement as a second floor story and not a Mezzanine as defined in the building code and Mezzanine Section 505. Please clarify design intent as either a second floor story or Mezzanine per building code Section 505. Revise title on drawings as necessary.
☒
A0.1
Construction of fire rated Exit passageway shall be continuous through the proposed canopy area.
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐