HomeMy WebLinkAbout242728_1_Corrections.docxSPC
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10196772
PROJECT ADDRESS:
1801 E Parkcourt Pl
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/20/2018
INITIAL REVIEW
7/2/2018
EXPIRATION
12/17/2018
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Victor Larey
3.
TEL:
(714)305-4955
FAX:
VALUATION:$20,000.00
EMAIL:
volarey@gmail.com
FLOOD ZONE:X-0602320164J
APPLICABLE CODE: 2016CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans
should be submitted to expedite the process.Provide a statement on first sheet of plans as to the scope of work under this permit.Provide a legend to identify where on the site plans the poles are to be located.Provide specs for the strength of concrete to be used.Please specify the source for the soil’s variable and whether the footing is located in certified compacted fill.