HomeMy WebLinkAbout243114_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10196890 PROJECT ADDRESS: 1105 S Oak St PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/28/2018 INITIAL REVIEW 9/12/2018 EXPIRATION 12/25/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Henry Albanez 3. TEL: (310)466-0092 FAX: VALUATION: $18,000.00 EMAIL: Albanez1971@gmail.com FLOOD ZONE: X-0602320276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016California Plumbing Code; CEC = 2016California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. The Approval report for “ GripTite” is expired and is based on the 1999 BOCA. Please use a product that has the product that has an ICC approval..The structural calcs and plans must be signed and stamped by the design engineer.. According to the structural package, Kenneth Breyer is the structural designer.Specify on the plans that special inspection is required for this project. Since the piles are being driven into the ground by pushing against the house, there is no factor of safety provided. In order to provide a factor of safety another pile should be driven at the same location.