HomeMy WebLinkAbout242488_3_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10196708
PROJECT ADDRESS:
2927 W Willits St
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/11/2018
INITIAL REVIEW
6/27/2018
EXPIRATION
12/8/2018
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Joel Soto
3.
TEL:
(714)654-2658
FAX:
VALUATION: $80,000.00
EMAIL:
FLOOD ZONE: X-0602320256J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3 corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
Provide a dimension of the stair’s width.
On the foundation plan, provide a different shade for the new footing proposed.
Holdown anchors using epoxy must have special inspection, provide notations on the details and plans.
Structural calcs page 7, specify those anchors using epoxy, and provide structural calcs and bolt specs( length diameter etc.) to show adequacy.( these are for the bolts supporting the holdown anchors specifically the large ones HDU’s. Per section 4.1.3 of ESR 2330, the holdown anchors are to be separately designed to resist the uplift loads. Please provide structural calcs and specifications as called out in correction 10 above.