HomeMy WebLinkAbout244899_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10197409
PROJECT ADDRESS:
1345 N Grand Ave
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
E
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/17/2018
INITIAL REVIEW
8/22/2018
EXPIRATION
2/13/2019
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Troy Gillam
3.
TEL:
(310)997-5690
FAX:
VALUATION:$0.01
EMAIL:
tgillian@greython.com
FLOOD ZONE:X-0602320163JResubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceTruss supplier shall submit calculations and shop drawings signed by a registered civil engineer to the responsible project designer who agrees to review the shop drawings for acceptance prior to fabrication. The engineer of records shall approved revision dated 7-11-18 as it is mentioned on the truss shop drawings. Shop drawings and calculations shall be submitted to the Building Safety Division for acceptance after the responsible project designer has noted his/her acceptance and prior to fabrication.”