Loading...
HomeMy WebLinkAbout240126_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10196029 PROJECT ADDRESS: 1920 N Sherry Ln PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/3/2018 INITIAL REVIEW 5/17/2018 EXPIRATION 9/30/2018 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Pete Larson 3. TEL: (949)235-4205 FAX: VALUATION:$15,000.00 EMAIL: larson_design@mac.com FLOOD ZONE:X-0602320164J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout.The space as shown next to the pool does not appear to qualify ae storage, it is more like a A3 occupancy.Based on the new plans, the use of the space as an exercise room with 15 occupant will be a B occupancy.Provide a site plan, an allowable area analysis and an occupancy analysis. Please dimension distances to adjoining buildings and property lines.Both structural and architectural plans need to be signed by a licensed engineer or architect.Complying exit doors should be provided.What was supporting the Exiting roof at the location of the large openining?The pictorial sign cannot be placed on the door, the door symbol can include circle and triangle. The pictorial can be placed on the side of the door. For additional information you can check the hand out on the website of office of the state architect.