HomeMy WebLinkAbout243067_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10196870
PROJECT ADDRESS:
3394 S Bristol St Unit# A
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/26/2018
INITIAL REVIEW
9/5/2018
EXPIRATION
12/23/2018
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Jason Sekine
3.
TEL:
(310)722-0143
FAX:
VALUATION:$100,000.00
EMAIL:
jasons@greeneaglela.com
FLOOD ZONE:X-0602320259J
APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Public Works Agency approval (647-5039)
- County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000)
All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).Provide the proper symbol on the proposed toilet; please see the latest publication by DSA Bulletin 17-01. You can access the Bulletin on the DSA website.Provide a hood attachment detail. This commercial hood seems to be too large please show the method of attachment and the weight of the hood.Provide a hood vent detail. Please note the vent shaft for the hood need to be rated based on the type of construction of the existing structure.This project need to comply with the green building code requirements. Please provide notes and details on the plans to show compliance.