Loading...
HomeMy WebLinkAbout246730_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10197952 PROJECT ADDRESS: 1910 E Warner Ave Unit# A PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/8/2018 INITIAL REVIEW 10/23/2018 EXPIRATION 4/6/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Nathan Menard 3. TEL: (714)552-2722 FAX: VALUATION:$10,000.00 EMAIL: nathan@menarch.com FLOOD ZONE:X-0602320279J APPLICABLE CODE: 2016CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840)Please clarify what kind of testing and what kind of chemicals is involved in the tests.Add a note to the demo plan to indicate that the where the opening are being made is not a bearing or shear wall.A pectoral sign is not allowed on the door, it is only allowed on the wall next to the door. The door sign can include the circle and triangle only. Please see the state interpretation on the Office of the state architect website.