HomeMy WebLinkAbout246751_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10197958
PROJECT ADDRESS:
1220 S Village Way Unit# A
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/8/2018
INITIAL REVIEW
10/16/2018
EXPIRATION
4/6/2019
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Robert Leiter
3.
TEL:
(714)564-7103
FAX:
VALUATION:$10,000.00
EMAIL:
rleiter@lee-associates.com
FLOOD ZONE:X-0602320277J
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)On first sheet of plans please indicate the scope of work under this permit.Identify using a wall legend all walls that are existing and will remain and those that will be removed.Specify the type of construction and occupancy group including if the building is sprinklered on plans.Specify the existing and proposed use of the space.Is there a TI permit for this project submitted under a separate permit number?Specify the use and occupancy of all rooms because of this TI. Please clarify if the intention is to keep this space unoccupied until a TI permit is submitted and issued! Or if the space is being converted into a warehouse.Please note for Tenant improvement, the path of travel to the area of remodel and the bathrooms serving the area of remodel need to be made accessible. Notes and details should be provided to show compliance.An accessible parking space in addition to access to the public way must be shown on the plans. In addition,an accessible entrance need to be shown.Provide an occupancy count to show compliance with the mechanical code for number of fixtures and number of bathrooms.The plans as shown now are incomplete, after all this information is properly shown on the plans, the plans should be resubmitted for plan check.