Loading...
HomeMy WebLinkAbout246778_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10197968 PROJECT ADDRESS: 2322 S Pullman St PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): F-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/9/2018 INITIAL REVIEW 10/19/2018 EXPIRATION 4/7/2019 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Juan Contreras 3. TEL: (949)445-5679 FAX: VALUATION:$118,000.00 EMAIL: jcontreras@axiommaterials.com FLOOD ZONE:X-0602320279J APPLICABLE CODE: 2016 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceDrawings must be to scale and be on 18” x 24” minimum sheets. - Provide an Index of Drawings on cover sheet - Provide a fully dimensioned Floor Plan Provide the following: - Disabled access compliance must be shown on the site plan.Provide complying exiting plan for the area. EXIT ACCESS. That portion of a means of egress system that leads from any occupied portion of a building or structure to an exit. CBC Sections 1016.Table 1017.1 Exit Access Travel Distance: OCCUPANCYWITHOUT SPRINKLERWITH SPRINKLERSYSTEM (feet)SYSTEM (feet) A, E, F-1, I-1, M, R, S-1200250b B200300c F-2, S-2, U300400c H-1Not Permitted75c H-2Not Permitted100c H-3Not Permitted150cExit illumination and exit sign requirements in accordance with CBC Section 1011 shall be shown on the drawings. Be specific as to the type of exit signs to be installed.Tactile exit signs shall be required at the following locations: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit door that leads directly to a grade-level exterior exit by means of an exit enclosure, or an exit passageway, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4 - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible drinking fountains, and - Parking, signage and alarmsComplete the attached Disabled Accessibility Documentation Form.Foam plastic installed in a maximum thickness of 10” in cooler and freezer walls to comply with Section 2603.4.1.2 of CBC. For foam plastic having a thickness that does not exceed 4” refer to Section 2603.4.1.3 of CBC. Provide complete wall construction detail to show compliance. Note ICC Research Report Number on the drawings for Walk-in cooler and or freezer.Provide structural calculation and drawings stamped an signed by a California registered engineer or Architect for the walk in cooler.Show path of travel to Walk in cooler.